Assistant Manager – Operations & Maintenance Updated On Mon, Dec 13th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Siemens Gamesa, Strohm to Improve Decentralized Green H2 Concept Updated On Mon, Dec 13th, 2021 by Saurenergy Netherlands-based Strohm, a manufacturer of Thermoplastic Composite Pipe (TCP) Flowline products, has been chosen by Siemens Gamesa Renewable Energy, a major wind engineering company, for a partnership aimed at developing hydrogen transfer solutions. The collaboration seeks to improve the decentralized green hydrogen concept, whereby green hydrogen is generated in each wind turbine generator and transported to […] Read more
Lead Engineer: Vehicle to Grid Charging Updated On Mon, Dec 13th, 2021 by Saurenergy If you desire to be part of something special, to be part of a winning team, to be part of a fun team – winning is fun. We are looking forward to Lead Engineer based in Pune, India. In Eaton, making our work exciting, engaging, meaningful; ensuring safety, health, wellness; and being a model of inclusion & diversity […] Read more
Azure Power Q2 Results. Not Enough To Enthuse Investors Updated On Mon, Dec 13th, 2021 by Saurenergy The NYSE listed Azure Power Global Limited announced its consolidated results under United States Generally Accepted Accounting Principles (“GAAP”) for the fiscal second quarter 2022, period ended September 30, 2021. Fiscal Second Quarter 2022 Period ended September 30, 2021 Operating Highlights: Megawatts (“MW”) Operating* were 2,210 MWs, as of September 30, 2021, an increase of 31% over September 30, 2020. […] Read more
Lead Engineer – FEA Updated On Fri, Dec 10th, 2021 by Saurenergy Tower Value Engineering department is responsible for providing optimized tower solution to Vestas tower program. The tasks range from understanding the design requirement and requirement specification, designing tower using analytical and FEM calculations, designing tower components, performing DFMEA, test planning and execution to risk assessments and compilation of certification documentation. Tower value engineering is extension […] Read more
Component Engineering Project Manager Updated On Fri, Dec 10th, 2021 by Saurenergy Drives and guides the creation of a functional architecture for a complete Component and of a technical realization concept over all its domain and technical aspects. Evaluates different concepts with respect to technological and commercial aspects. Specifies and integrates standard products and subcomponents according to the required functionality of the component and coordinates their interfaces […] Read more
India’s 2030 Climate Targets are ‘achievable’ through Renewables: Says LBNL 2030 Updated On Fri, Dec 10th, 2021 by Saurenergy There is no doubt that India is in midst of an energy transition, with important social and economic implications depending on the pathways that are chosen. A Lawrence Berkeley National Laboratory (LBNL) study, under the US Department of State evaluated in-depth India’s future power investments. Giving a promising outlook on India’s future power system investments, […] Read more
MNRE Gets Approval For Rs 454 Crore Spends To Support Renewables for the Next 5 Years Updated On Fri, Dec 10th, 2021 by Saurenergy The approvals, covering the period 2021-22 to 2025-26, have all been communicated this week. Covering the areas of supporting research and development (Rs 228 crores), Public Awareness (Rs 26 crores) and Human Resources Development ( Rs 200 crores), the idea is to provide the MNRE with funds to achieve key objectives. While readers will be […] Read more
TNERC Allows TANGEDCO To Get Away With 6% Interest On Delayed Payments Updated On Fri, Dec 10th, 2021 by Saurenergy The Tamil Nadu Electricity Regulatory Commission (TNERC) has recently ruled in favour of a wind energy producer Rajaguru Spinning Mills Private Limited, directing the Tamil Nadu Generation and Distribution Corporation (TANGEDCO) to make payments to the producer with 6% interest per annum within a month. Aggrieved at delayed settlement of invoices pertaining to a wind […] Read more