JSW Achieves 3.1 GW Of Locked-In RE Generation Capacity Updated On Mon, Dec 16th, 2024 by Saurenergy Mumbai-based JSW Energy announced securing multiple renewable energy (RE) projects in the Commercial and Industrial (C&I) power market. With this latest project, JSW achieved a total locked-in power generation capacity of 20 GW. The company’s locked-in renewable energy (RE) C&I capacity now stands at 3.1 GW. This includes 2,654 MW of JSW group captive capacity […] Read more
Grid Study Engineer Updated On Fri, Dec 13th, 2024 by Saurenergy You will provide simulations and reports to SGRE’s Grid Engineer Managers, more specifically, your assignments will cover: Grid Code and Developer-requirement analysis. Modeling of Offshore Wind Farms; these models will be used to perform steady state, dynamic, transient and frequency domain simulations. Perform Steady State simulations to evaluate compliance to requirements related to: Short Circuit, […] Read more
Green Stocks Dec 13: Stocks Of Shakti Pumps Continue To Rise Updated On Fri, Dec 13th, 2024 by Saurenergy On a day when several green stocks fluctuated in the volatile share market, the stocks of Shakti Pumps continued to shine. The stocks of Indore-based solar pump company which witnessed a rise of 5% yesterday, reported another 5% surge in its stock price. Among all the green stocks we analyze daily, Shakti Pumps reported the […] Read more
Indus Towers, JSW Arm Invest Rs. 38.03 Cr For 130 MW Solar Project Updated On Fri, Dec 13th, 2024 by Saurenergy Indus Tower, a Haryana-based telecom tower company today entered into a power purchase agreement (PPA) with JSW Green Energy Eight Limited, a special purpose vehicle (SPV). Under this agreement, Indus Tower would receive 130 MW of renewable energy from a solar power plant under captive mode. The company also agreed to make approximately Rs 38.03 […] Read more
Premier Energies To Setup 1GW Of New Module Unit In Telangana Updated On Fri, Dec 13th, 2024 by Saurenergy Premier Energies today announced the approval of its Board for setting up a new 1 GW of new solar module unit. The new TOPCOn-based solar module factory has been planned at Maheeshwaram in Telangana. The Telangana-based solar module and cell maker informed about its latest move in its filings. The company spearheaded by Surender Pal […] Read more
Ambuja Cements Commissions 200 MW Solar Project At Khavda Updated On Fri, Dec 13th, 2024 by Saurenergy Ambuja Cements, a cement and building material company, today commissioned and began power transmission from its 200 MW solar power project in Khavda in Gujarat. The balance 806 MW capacity from this project is at various stages of commissioning and is expected to start transmitting in phases between March 2025 and June 2025. This development […] Read more
Parliamentary Panel Bats For More Household Level Electrification Updated On Fri, Dec 13th, 2024 by Saurenergy A Parliamentary Standing Committee On Energy has now presented its first report of the panels. The panel in their key recommendations batted for the inclusion of more households for electrification. The panel was chaired by Lok Sabha MP Appa Barne. The panel also advocated for the use of more funds for the Scheduled Caste and […] Read more
Manager – Lead OEM Coordinator Updated On Thu, Dec 12th, 2024 by Saurenergy We are seeking an accomplished Renewable Energy SCADA expert with a strong technical background in IT networking, firewalls, and operational technology (OT) security. As the SCADA expert, you will be responsible for the end-to-end management of SCADA systems, emphasizing cybersecurity, network resilience, and the seamless integration of OT and IT environments within renewable energy projects. […] Read more
Assistant Manager – PMO ( Solar Manufacturing Projects) Updated On Thu, Dec 12th, 2024 by Saurenergy Support area infrastructure planning efforts at various stages, facilitate development of cost estimates and budgets, and establish reasonable cost and schedule baselines. Scheduling / Planning: Developing L-1 to L-2 schedule, S-curve and extrapolating it to L-4 to L-5 breakdown. Creating WBS for L4-L-5 level by identify the critical chain of the task. Monitoring/identifying the resource […] Read more