Specialist – Hardware Development Engineer Updated On Thu, Sep 15th, 2022 by Saurenergy Specification, architectural design and design of electronic circuits for automotive applications Accompanying development documentation Circuit validation through calculations and simulations Standard-compliant circuit design (eg VDE) and component selection Commissioning and tests Support of testing and qualification of hardware Implementation of FMEAs / FMEDAs Development and monitoring of schedules for hardware development Qualification And Experience:- Completed engineering studies in the field of electrical engineering […] Read more
Platform software -Engineering Manager Updated On Thu, Sep 15th, 2022 by Saurenergy Responsible for Platform SW Integration for various AUTOSAR modules such as COM/DEM/DCM/ based on Customer milestones Interact with the System team and Customer to get the proper software requirements. Responsible to understand Sys Requirement and convert to PSW requirement Responsible to ensure PRs(Problem reports) reported anlayzed and root caused Understand various project/ECUs environment according to […] Read more
Spain’s PV Hardware to Set Up Solar Tracker Facility in USA Updated On Mon, Sep 12th, 2022 by Saurenergy Global solar tracker manufacturer PV Hardware (PVH) has announced plans to set up a large manufacturing unit in Texas, United States of America, to localise its products to supply for projects across North America. The company said that the capacity of the new facility will be 6 GW and it will be operational by June […] Read more
Adani Announces Three Gigafactories as Part of $70 Billion Investment Updated On Thu, Sep 8th, 2022 by Saurenergy The Chairman and Founder of Adani Group, Gautam Adani has said that his company, Adani Group, will be investing in the construction of three giga-factories that will manufacture key equipment required for the expansion of renewable energy. The three gigafactories will be part of the $ 70 billion investment by the group in clean and […] Read more
Start-Up Jungle Raises €5 Million to Deploy AI Technology in RE Sector Updated On Wed, Sep 7th, 2022 by Saurenergy Dutch artificial intelligence start-up Jungle has announced that it has closed a €5 million Series A funding round led by SHIFT Invest- Dutch venture capital fund complemented by Rocks International Group, EDP Ventures, Gorilla Growth Capital and Future Energy Ventures. Jungle said that the funding will allow it to speed up the deployment of its […] Read more
Assistant Lead Engineer – CATIA Modelling Updated On Mon, Sep 5th, 2022 by Saurenergy The Assembly, Finish and Add-on department is a part of the blade module in Vestas and is accountable for all processes, CATIA 3D models and drawings within blade assembly, paint, finish and add-ons for all on- and offshore blades. Furthermore, the department is involved in new blade technology projects and is supporting internal and external […] Read more
Electrical Design Engineer – LV Panels & Cables Updated On Mon, Sep 5th, 2022 by Saurenergy SAE is responsible for delivering optimized and high quality control solutions for our Wind Turbines including the functional safety. This includes the real-time communication backbone that ties all the distributed control nodes together, the real time operating system of the control nodes and the high-level functionality that control all operation in the turbine. SAE is […] Read more
US-Based CalWave Completes Open-Ocean Wave Energy Pilot Project Successfully Updated On Fri, Sep 2nd, 2022 by Saurenergy After 10 months of nonstop operation off the coast of San Diego, US-based wave energy developer company CalWave has completed its open-ocean wave energy pilot project. The project, which began operations in September 2021, was sponsored by the US Department of Energy (DOE) to showcase CalWave’s scalable and patented xWaveTM technology as a cost-effective, sustainable […] Read more
Denmark, Germany to Develop Bornholm Energy Island of 3 GW Updated On Tue, Aug 30th, 2022 by Saurenergy The Danish Government has said that it will increase the energy producing capacity at the Bornholm Energy Island in the Baltic Sea by 1 GW (increasing it from 2 GW to 3 GW) and the power will be transferred to the German grid. This is happening because the government has signed two political pacts taking […] Read more