IKEA Investment Arm Secures Norwegian Offshore Wind Project Updated On Thu, Mar 21st, 2024 by Saurenergy Ventyr, a consortium consisting of Parkwind and Ingka Investments, the investment arm of Ingka Group, the largest IKEA retailer, has announced its success in the Norwegian auction for the development of the Sørlige Nordsjø II phase 1 offshore project area in the Southern Norwegian North Sea. According to a media statement by Parkwind, part of […] Read more
Amazon, East Anglia Three Offshore Wind Farm Sign PPA For 159 MW RE Updated On Thu, Mar 21st, 2024 by Saurenergy Amazon recently agreed to procure 159MW from East Anglia Three, developed by Iberdrola, when the site becomes operational. An American multinational technology company collaborated with Iberdrola, which claims to be one of the world’s largest clean energy companies. Amazon expanded its long-term global clean power partnership by signing a renewable energy power purchase agreement (PPA) […] Read more
Senior Wind Analyst Updated On Wed, Mar 20th, 2024 by Saurenergy Perform quality control of meteorological data such as met mast, LiDAR and SoDAR’s Design of optimal site-specific measurement campaigns for wind farm sites, including cost/benefit assessments of different technologies Follow the BPP process and carry out energy yield estimation and propose relevant optimization based on constraints Responsible and take ownership in specific development projects for […] Read more
Wind Specialist Updated On Wed, Mar 20th, 2024 by Saurenergy Oversee the collection and quality control of meteorological data to ensure maximum data coverage and minimum uncertainty Ensure meteorological station contractors comply with relevant safety and technical requirements Design of optimal site-specific measurement campaigns for wind farm sites, including cost/benefit assessments of different technologies Align with the BPP process and carry out energy yield estimation […] Read more
Maersk Partners With Edison Chouest For US Offshore Wind Farm Updated On Mon, Mar 18th, 2024 by Saurenergy Maersk Supply Service will partner with Edison Chouest Offshore (ECO) for the construction and operation of a wind farm feeder concept specifically designed for Maersk Supply Service’s next-generation Wind Installation Vessel in the United States. Maersk Supply Service looks to enable the steady transfer of turbine components at sea to accelerate the rollout of offshore […] Read more
SolarDuck, Green Arrow Capital Join Hands For 540 MW Hybrid Offshore Wind-Solar Farm In Italy Updated On Fri, Mar 1st, 2024 by Saurenergy Dutch-Norwegian cleantech company SolarDuck, Italian Independent Asset Manager Green Arrow Capital, and Italy-based developers New Developments s.r.l have agreed to collaborate on the development of 120MWp Offshore Floating Solar Photovoltaic (OFPV) farm integrated with a 420MW Floating Offshore Wind (FOW) project in Corigliano, Calabria, Italy. According to a press release by SolarDuck, the project will […] Read more
K.P Energy Commissions 25.2 MW ISTS Connected Wind Power Project At Sidhpur Updated On Wed, Feb 28th, 2024 by Saurenergy K.P Energy Limited, a Balance of Plant (BoP) solutions provider for the wind energy industry commissioned a 25.2MW (Phase-VI) Inter-State Transmission System (ISTS) connected wind power project at Sidhpur, in Devbhoomi Dwarka The wind energy company is involved in the entire wind farm development value chain, right from conceptualization to the commissioning of the project. […] Read more
Vestas Secures 153 MW Wind Energy Order In US Updated On Tue, Feb 27th, 2024 by Saurenergy Renewable energy company Vestas received a 153 MW order to power an undisclosed wind project in the USA. The order consists of 34 V150-4.5 MW wind turbines. The orders include supply, delivery, and commissioning of the turbines, as well as a multi-year Active Output Management 5000 (AOM 5000) service agreement, designed to ensure optimized performance […] Read more
Commissioning Supervisor – Wind Turbine Authorized Technician Updated On Mon, Feb 19th, 2024 by Saurenergy Responsibilities:- Reviews contractual documentation Reviews engineering documents to ensure that the commissioning & startup requirements are accounted for in the design Prepares and keeps up to date the pre-commissioning and commissioning execution plans (including the schedule and the mobilization of personnel and equipment) Electrical, mechanical, and hydraulic work on WTG’s On-site supervision of new and […] Read more