KPI Green Energy Approves Fundraising Proposal Worth Rs 1,000 crore Updated On Wed, May 15th, 2024 by Saurenergy KPI Green Energy has approved the proposal of raising Rs 1,000 crore in a recently held board meeting. According to a regulatory filing, KPI Green Energy will raise the funds through the issuance of equity shares of the Company or any other equity-linked securities of the Company or other securities convertible into or exchangeable for […] Read more
India Issued 69GW+ Renewable Tenders In FY24, Says IEEFA Report Updated On Mon, May 6th, 2024 by Saurenergy The Institute of Energy Economics and Financial Analysis (IEEFA) in its latest report indicated a record 69+ Gigawatt (GW) of renewable energy tenders in India in 2023-24. This is against the Indian government’s own annual target of 50 GW. The global energy think tank attributed this to the strong push from the Union government at […] Read more
Senior Electrical Engineer_Renewable Updated On Fri, Apr 26th, 2024 by Saurenergy Responsibilities will be mainly to assess the renewable energy investment (solar, wind, hybrid etc.) – technically and commercially and provide required guidance that will enable the companies to take strategic decisions. Basic and Detail Engineering PV plants, Pooling substations and Transmission lines up to 400kV level. Understanding of policy and regulatory framework for deployment of […] Read more
KPI Green Delivers Stellar Q4 and full year Results, 1.23 GW project Pipeline Updated On Fri, Apr 26th, 2024 by Saurenergy Surat-based Solar EPC firm KPI Green Energy has come out with a strong set of Q4 results. Total revenues came in at Rs 293 crores during the quarter, a 59% increase over the corresponding quarter in Fy23. Net profit rose Rs 43 crores, up 36% over the same quarter last year. For the full year, […] Read more
CERC Allows Fortum Subsidiary To Retain Connectivity For 300 MW Karnataka Project Updated On Thu, Apr 25th, 2024 by Saurenergy In an interesting order earlier this week, the Central Electricity Regulatory Commission allowed SolarOne Energy Private Limited, a subsidiary of Finnish major Fortum, to retain 300 MW connectivity it had been allotted from the Central Transmission Utility of India Limited (CTUIL). The issue arose after CTUIL moved to cancel connectivity citing failure to sign PPA […] Read more
Senior Consultant Renewable Updated On Tue, Apr 23rd, 2024 by Saurenergy This position is responsible for the project management and technical evaluation associated with the technical due diligence of project acquisitions, preparation of feasibility and detailed project reports. Responsibilities will be to mainly to assess the renewable energy investment (solar, wind, hybrid, BESS etc.) – technically and commercially and provide required guidance that will enable the […] Read more
Head- Project Development Updated On Wed, Apr 3rd, 2024 by Saurenergy As a Head- Project Development, you would be reporting to the Director – Business and Project Development. This a senior role responsible for overseeing and managing the end-to-end development of wind, solar and hybrid projects. This position shall play a crucial role in driving the growth of the company’s renewable portfolio, identifying project opportunities, conducting feasibility studies, […] Read more
Adani Green Races Past 10 GW Operational Milestone In March’24 Updated On Wed, Apr 3rd, 2024 by Saurenergy With a string of plants being operationalised all through March last month, Adani Green Energy Limited (AGEL)has surpassed 10,000 megawatts (MW) of a completely green operational portfolio. AGEL’s operational portfolio consists of 7,393 MW solar, 1,401 MW wind and 2,140 MW wind-solar hybrid capacity. The milestone is a key landmark for AGEL’s goal of 45,000 […] Read more
Engineering Manager – Renewables Updated On Wed, Mar 27th, 2024 by Saurenergy The Engineering Manager – Renewables will be responsible for the execution of multi-discipline engineering scope of work on renewable energy projects, typically solar PV, storage and hybrid and onshore wind technologies, at the pre-FEED and FEED to 30% and 60% design completion. She/he will be the engineering authority and lead a team of engineering disciplines to meet HSSE, quality, […] Read more