Khavda: Adani Green Signs JV Pact With TotalEnergies Updated On Mon, Sep 30th, 2024 by Saurenergy Indian renewable project developer Adani Green has now signed a Joint Venture (JV) agreement with Singapore-based energy company TotalEnergies to boost the growth of renewable energy projects at Khavda in Gujarat. The JV had been announced earlier this month. “In continuation of the Company’s earlier submission dated September 02, 2024 and subsequent to approval of […] Read more
Principal Electrical Engineer – Primary Updated On Fri, Sep 27th, 2024 by Saurenergy Responsibilities:- Ability to lead the Primary Design (Concept, FEED , Detail Design) for AIS/GIS/Hybrid Substations upto 400kV – for Utility Companies /Developers, based on international standards – for, UK, Europe, Middle East , South East Asia or Australia regions. Experience in Design of HV/LV Distribution systems for Oil & Gas Sector , offshore Substation, Thermal […] Read more
Powergrid Bags Khavda 7GW RE Transmission Project Updated On Fri, Sep 20th, 2024 by Saurenergy The Powergrid Corporation of India Limited (PGCIL) announced a new renewable energy evacuation project from Khavda in Gujarat. The Central Public Sector Enterprise (CPSE) informed the stakeholders regarding the latest development in its filing before the stock exchange. As per the plan, the company with this project will help in evacuating 7 GW of green […] Read more
Research Analyst – Steel and Raw Materials Updated On Wed, Sep 18th, 2024 by Saurenergy Steel will play a pivotal role in the global energy transition and will be an integral part of solar panels, wind turbines, electric vehicles, dams, etc. In parallel the industry will also create a number of opportunities for newer technologies and energy products especially hydrogen as it decarbonizes. Industry stakeholders across the steel and raw […] Read more
Manager Renewable Engineering (Control & Instrumentation Engineer) Updated On Tue, Sep 17th, 2024 by Saurenergy We are seeking a leading role in the Renewable Engineering Control & Instrumentation (C&I) division for our Renewable Energy (RE) Power Plants which will be a mix of Solar, Wind, and BESS systems. This position is responsible for C&I engineering which includes major development of control architecture of complete solar + wind + BESS Hybrid […] Read more
NVVN Seeks Bids to Set Up 250 MW/500 MWh Standalone BESS Updated On Tue, Sep 10th, 2024 by Saurenergy NTPC subsidiary, Vidyut Vyapar Nigam Limited (NVVN), recently released a tender for setting up 250 MW/500 MWh standalone battery energy storage systems with viability gap funding support. NTPC released this tender under a tariff-based global competitive bidding request. The last date for bid submission is 17th September 2024. As per the NTPC Vidyut Vyapar Nigam […] Read more
Borosil Renewable In Deal With Clean Max For Green Energy Updated On Thu, Sep 5th, 2024 by Saurenergy Indian solar glass manufacturer Borosil Renewable has announced acquiring 49 percent stake in Clean Max Prithvi Pvt Ltd (CMPPL) and Clean Max Enviro Energy Solutions Pvt Ltd. The Mumbai-based company in its recent filing before the Bombay Stok Exchange (BSE) said. Indian open access law requires offtakers to acquire proportionate stakes in firms supplying green […] Read more
NHPC Revises MoU With Maharashtra Govt For 7,350 MW PSPs Updated On Wed, Sep 4th, 2024 by Saurenergy On September 3, State owned NHPC (National Hydroelectric Power Corporation Private Limited) said that it has re-entered a memorandum of understanding (MoU) with the Maharashtra’s Department of Water Resources (WRD) for 7,350 MW renewable energy storage systems. The MoU aims to establish energy storage systems, specifically pumped storage projects (PSPs), in the state of Maharashtra. […] Read more
Adani, Sterlite Power Complete Acquisition of Transmission Networks For 7 GW Evacuation from Khavda Updated On Mon, Sep 2nd, 2024 by Saurenergy Adani Energy Solutions Ltd (AESL), the transmission and distribution company of the Adani group, has completed the acquisition of the Special Purpose Vehicle (SPV) of the Khavda Phase IV Part-A transmission project, after receiving a letter of intent (LOI) from REC Power Development and Consultancy Ltd. Khavda IVA Power Transmission Ltd, a special purpose vehicle […] Read more