SJVN Seeks Developers to Supply & Maintain 18 MW Solar Projects Updated On Thu, Oct 19th, 2023 by Saurenergy SJVN Green Energy Ltd, a wholly owned subsidiary of SJVN has issued a tender to invite bids for the design, engineering, supply, erection, testing, commissioning of grid connected solar power project of cumulative capacity of 18 MW (AC) at four different locations of Bhakra Beas Management Board (BBMB), including three (03) years of comprehensive operation […] Read more
SME – Solar Tracker Structure Updated On Thu, Oct 19th, 2023 by Saurenergy Responsible for timely, innovative, cost effective and workable engineering solutions for innovative and complex Structural Engineering challenges identified for Renewable Energy Sector. The SME shall co-ordinate with of other disciplines viz., Electrical, MEP and others (BU) for receiving innovative and complex challenges and deliver necessary solutions. The SME shall be able to prepare / review the tracker structural calculations, bring in structure design optimization, bring […] Read more
Ilmatar’s 17.2 MW Wind Park in Finland Kicks Off Operations Updated On Wed, Oct 18th, 2023 by Saurenergy Nordic energy firm and an independent power producer that delves into the development, construction and maintenance of renewable energy, Ilmatar, has powered up its Palma Wind Park located in Somero, southern Finland. The project that boasts of 17.2 MW capacity was commissioned ahead of schedule as per the firm. The wind park has four 4.3 […] Read more
MERC Allows Tata Power Extension On SCOD For Its Hybrid Plants Updated On Tue, Oct 10th, 2023 by Saurenergy The Maharashtra Electricity Regulatory Commission (MERC), in its latest judgment, allowed the Tata Power Green Energy (TPGEL) extension on its Scheduled Commercial Operation Date (SCOD) for two solar-wind hybrid projects. It included the 225 Megawatt (MW) hybrid project at Bikaner district in Rajasthan and a 98.05 MW hybrid plant in Maharashtra. The hybrid renewable energy generator […] Read more
Rajasthan Notifies Renewable Energy Policy: Solar Keeps Wind In Shadow Updated On Sat, Oct 7th, 2023 by Saurenergy This week has turned out to be an eventful when it comes to the renewable energy policy landscape with the two leading states in capacity additions- Gujarat and Rajasthan unveiling their Renewable Energy Policies. Ambitions The policy newly unveiled policy strives for 90 GW of solar capacity in the state by decade-end. It also eyes […] Read more
Rooftop, CPP & Hybrid Projects Take Precedence in Gujarat Renewable Energy Policy 2023 Updated On Thu, Oct 5th, 2023 by Saurenergy Gujarat Chief Minister Bhupendra Patel has released the Gujarat Renewable Energy Policy 2023. The Policy, whose operative period is upto 2028 or till notification of new policy (whichever is earlier), sets sights on achieving some big goals defined by the State and places a premium on solar-wind hybrid projects. Goals Chalked Out The State will […] Read more
KPI Green Energy Bags 145.20 MW Wind-Solar Project from Ayana Renewable Power Updated On Mon, Sep 25th, 2023 by Saurenergy Independent Power Producer (IPP) KPI Green Energy Limited has been awarded a Letter of Intent (LOI) for a 145.20 MW wind-solar hybrid power project (comprising 145.20 MW wind and 50 MW solar) by Ayana Renewable Power Four Private Limited, based in Bangalore. The project is scheduled to be completed in the financial year 2024-25. The […] Read more
Suzlon Bags 29.4 MW Wind Power Order from BrightNight Updated On Fri, Sep 22nd, 2023 by Saurenergy Suzlon Group, a renewable energy solutions provider, has announced a new order win for the development of a 29.4 MW of wind installed capacity for 100 MW co‐located wind‐solar hybrid project of BrightNight, a global renewable power producer. Suzlon will install 14 units of their S120-140m wind turbine generators (WTGs) with a Hybrid Lattice Tubular […] Read more
Gujarat Releases Draft Renewable Energy Policy-2023 with Focus on Wind-Solar Hybrid Technologies Updated On Thu, Sep 21st, 2023 by Saurenergy The Government of Gujarat has notified the Renewable Energy Policy-2023 for further encouraging setting up of renewable generation projects based on wind, solar and wind-solar hybrid technologies. The policy will come into effect from the date of notification and shall remain in operation up to June 2028 or till notification of the new policy, whichever […] Read more