AGEL Arm Wins Compensation Claim From CERC For Rajasthan Wind Solar Hybrid Project Updated On Fri, May 3rd, 2024 by Saurenergy In a petition brought forward as the developer of a 450 MW ISTS connected Wind-Solar Hybrid power project, entered between Adani Solar Energy Jaisalmer One Private Limited (formerly known as SBE Renewables Ten Projects Private Limited) and Solar Energy Corporation of India Limited seeking Change in Law compensation along with Carrying Cost, the CERC had […] Read more
CleanMax Inaugurates 400 MW Wind Solar Hybrid Project in Gujarat Updated On Mon, Jul 31st, 2023 by Saurenergy CleanMax Enviro Energy Solutions, a C&I renewable energy firm has inaugurated a 400 MW wind-solar hybrid project in Babra, Gujarat. The firm says that this is the first project to have the latest 3.3 MW Envision turbines. The said project was completed within 16 months of inception, and it was ensured that only unutilized commercial […] Read more
MSEDCL Invites RFS for 500 MW Wind Solar Hybrid Projects Updated On Fri, Oct 7th, 2022 by Saurenergy Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) has invited RFS (request for selection) for 500 MW of solar wind hybrid project tender on a long-term basis. In this tender, the power will be purchased through a competitive bidding process from this 500 MW intra-state grid-connected hybrid power project. The last date for submitting the online […] Read more
Hybrid Solar, Wind Projects To Fuel Cochin Shipyard Operations Updated On Wed, Sep 25th, 2024 by Saurenergy The Kerala government’s Energy Management Centre (EMC) has initiated plans to power Cochin Shipyard Limited (CSL) with renewable energy. To move forward with this initiative, a tender has been issued seeking consultants for the project. The last date of bid submission is September 30. Established in 1972, Cochin Shipyard Limited is a prominent shipbuilding and […] Read more
Avaada Energy Wins 250 MW Solar-Wind Hybrid Project From NTPC Updated On Thu, Apr 18th, 2024 by Saurenergy Indian renewable energy company Avaada Energy recently announced winning a 250 MW solar-wind hybrid power project in a tender issued by the National Thermal Power Corporation (NTPC). Earlier, NTPC had issued a tender for the selection of hybrid power generators to supply 1000 MW of power through ISTS-connected wind-solar hybrid projects. Avaada Energy secured a 50 […] Read more
Torrent Power Secures 450 MW Wind-Solar Hybrid Project Updated On Mon, Apr 1st, 2024 by Saurenergy Torrent Power, a Gujarat power company has announced it has secured 300 MW power from wind-solar hybrid energy projects, with a greenshoe option of up to 150 MW through an auction. Further, the company also stated that it won the auction after quoting Rs 3.65/kWh The tender for 300 MW of power supply, with a […] Read more
KPI Green Bags 50MW Of Wind-Solar Hybrid Power Project From GUVNL Updated On Fri, Mar 15th, 2024 by Saurenergy Gujarat based KPI Green energy a renewable energy company recently announced that it emerged as a successful winner for Gujarat Urja Vikas Nigam Limited (GUVNL) 50MW of Wind-Solar Hybrid Power Project. KPI received the letter of Intent, in which it was awarded 50MW (comprising of 16.80 MW Wind and 50MW Solar) Wind-Solar Hybrid Power Project. The […] Read more
GIWEL Receives LOA For 440MW Wind-Solar Hybrid Project From SJVN Updated On Mon, Mar 11th, 2024 by Saurenergy Singapore-based renewable energy company Sembcorp through its wholly owned renewables subsidiary Green Infra Wind Energy Limited (GIWEL), received a letter of award (LOA) for a 440MW inter-state transmission system (ISTS) connected wind-solar hybrid power project from SJVN Limited. The GIWEL project is a build-own-operate (BOO) project which is part of a 1.5GW bid issued by […] Read more
SECI Invites RFS for 1200 MW ISTS Wind-Solar Hybrid Projects in India Updated On Thu, Feb 22nd, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has issued a Request for Selection (RfS) for the development of 1200 MW of Wind-Solar Hybrid Power Projects on a Build-On-Own basis. The projects have been launched under the tariff-based competitive bidding under Tranche-8 of SECI. A single-stage, two-envelope bidding procedure will be adopted and will proceed as […] Read more