SUBSCRIBE NEWS LETTER

wind projects

Bids for setting up of Wind Power Projects of over 8000 MW Capacity Finalised

The wind power projects in the country are installed on the basis of commercial viability through tariff based competitive bidding process. As on date, the bids for setting up of wind power projects of aggregate 8389.90 MW capacity have been finalised through Solar Energy Corporation of India Ltd. (SECI) and National Thermal Power Corporation Ltd. […]

Read more

Results of E-Bidding and E-RA for 1200 mw ISTS-Connected Wind Power Projects (Tranche-v)

SOLAR ENERGY CORPORATION OF INDIA LIMITED Selection of 1200 MW ISTS-connected Wind Power Projects (Tranche-V) (RfS No: SECI/C&P/WPD/1200MW/T5/RfS/022018 dated 30.06.2018) After Technical Bid Opening After e-Reverse Auction (held on 25.09.2018) Sl. No. Bidder’s Name Capacity (MW) Bidder’s Name Bidder’s Quantity (MW) Tariff (INR/kWh) Awarded capacity (MW) 1 Alfanar Company 300 Torrent Power Limited 115 2.76 […]

Read more

Consumers, Integrators Seek Single-window for Solar Power Projects in Goa

The integrators were attending the Goa Conference’s second edition on Solar Energy in Panaji, the capital of Goa. They vigorously questioned the role of the electricity department and the GEDA. To deal with all grid-connected solar power projects, Integrators and consumers of solar power systems have appealed for a single window system for smooth installations. […]

Read more

Govt Brings National Policy for Wind-Solar PV Hybrid Projects

A scheme for new hybrid projects under the policy is also expected shortly. The government has issued a new national wind-solar hybrid policy aiming to provide framework for promotion of large grid connected wind-solar PV hybrid system for efficient utilization of transmission infrastructure and land. The Ministry of New and Renewable Energy (MNRE) also said […]

Read more

MEETING WITH PROSPECTIVE BIDDERS : RFS FOR SETTING UP OF 2000 MW ISTS-CONNECTED WIND POWER PROJECTS (TRANCHE-IV)

This has reference to the RfS documents (RfS No. SECI/C&P/WPD/2000MW/T4/RfS/012018 dated 05.02.2018) for Setting up of 2000 MW ISTS-Connected Wind Power Projects (Tranche-IV). All the prospective bidders are requested to attend for a meeting (as per below schedule) to be chaired by Director (PS) of SECI. Date of Meeting : 14.03.2018 (Wednesday) Time : 12:00 […]

Read more

Amendment-I : RfS FOR SETTING UP OF 2000 MW ISTS-CONNECTED WIND POWER PROJECTS (TRANCHE-IV)

This has reference to the RfS documents (RfS No. SECI/C&P/WPD/2000MW/T4/RfS/012018 dated 05.02.2018) for Setting up of 2000 MW ISTS-Connected Wind Power Projects (Tranche-IV) The Amendment – I has been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser). Prospective bidders are requested to refer to TCIL website for details. Tender Search Code (TSC) for […]

Read more

Gamesa to Facilitate Solar and Wind-solar Hybrid Power Projects in Andhra Pradesh

Spanish firm Gamesa will facilitate investors to set up solar and wind-solar hybrid and wind power projects in Andhra Pradesh. Spanish wind turbine-maker Gamesa will facilitate around Rs 17,500 crore investment in Andhra Pradesh in wind, solar and wind-solar hybrid power projects, said a top official of the company’s Indian subsidiary. “Gamesa will facilitate investors […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll