SECI Floats Tender For 1200 MW Wind Power Projects Tranche-VII Updated On Mon, Feb 18th, 2019 by Saurenergy The detailed RfS Document shall be available for download by February 22, 2019. The Solar Energy Corporation of India (SECI) has issued tender inviting bids for setting up of 1200 MW ISTS Connected Wind Power Projects (Tranche-VII) on a pan India basis. The detailed Request for Selection (RfS) Document shall be available for downloading by February 22, […] Read more
NIT FOR SETTING UP OF 1200 MW ISTS-CONNECTED WIND POWER PROJECTS IN INDIA (TRANCHE-VII) Updated On Fri, Feb 15th, 2019 by Saurenergy Solar Energy Corporation of India Ltd. (SECI) invites online bids for Setting up of 1200 MW ISTS Connected Wind Power Projects (Tranche-VII) on a pan India basis. The detailed Request for Selection Document (RfS) shall be available for downloading by 22.02.2019 onwards on www.tcil-india-electronictender.com. Prospective bidders are requested to remain updated for any notices/amendments/clarifications etc. to the […] Read more
RESULTS OF E-BIDDING AND E-RA FOR 1200 MW ISTS-CONNECTED WIND-SOLAR HYBRID POWER PROJECTS (TRANCHE-I) Updated On Wed, Feb 13th, 2019 by Saurenergy For Full information: Click here Read more
SECI Issues RfS for 1200 MW Wind-Solar Hybrid Power Projects Updated On Wed, Jan 2nd, 2019 by Saurenergy The maximum tariff payable to each WPD is fixed at Rs 2.85/kWh for the entire term of 25 years. State-owned Solar Energy Corporation of India (SECI) has issued Request for Selection (RfS) document for setting up of 1200 MW ISTS connected wind power projects (Tranche-VI) on “Build Own Operate” basis. This 1200MW solar-wind hybrid tender […] Read more
Bids for setting up of Wind Power Projects of over 8000 MW Capacity Finalised Updated On Thu, Dec 27th, 2018 by Saurenergy The wind power projects in the country are installed on the basis of commercial viability through tariff based competitive bidding process. As on date, the bids for setting up of wind power projects of aggregate 8389.90 MW capacity have been finalised through Solar Energy Corporation of India Ltd. (SECI) and National Thermal Power Corporation Ltd. […] Read more
Results of E-Bidding and E-RA for 1200 mw ISTS-Connected Wind Power Projects (Tranche-v) Updated On Sat, Oct 27th, 2018 by Saurenergy SOLAR ENERGY CORPORATION OF INDIA LIMITED Selection of 1200 MW ISTS-connected Wind Power Projects (Tranche-V) (RfS No: SECI/C&P/WPD/1200MW/T5/RfS/022018 dated 30.06.2018) After Technical Bid Opening After e-Reverse Auction (held on 25.09.2018) Sl. No. Bidder’s Name Capacity (MW) Bidder’s Name Bidder’s Quantity (MW) Tariff (INR/kWh) Awarded capacity (MW) 1 Alfanar Company 300 Torrent Power Limited 115 2.76 […] Read more
Consumers, Integrators Seek Single-window for Solar Power Projects in Goa Updated On Sat, May 26th, 2018 by Saurenergy The integrators were attending the Goa Conference’s second edition on Solar Energy in Panaji, the capital of Goa. They vigorously questioned the role of the electricity department and the GEDA. To deal with all grid-connected solar power projects, Integrators and consumers of solar power systems have appealed for a single window system for smooth installations. […] Read more
Govt Brings National Policy for Wind-Solar PV Hybrid Projects Updated On Tue, May 15th, 2018 by Saurenergy A scheme for new hybrid projects under the policy is also expected shortly. The government has issued a new national wind-solar hybrid policy aiming to provide framework for promotion of large grid connected wind-solar PV hybrid system for efficient utilization of transmission infrastructure and land. The Ministry of New and Renewable Energy (MNRE) also said […] Read more
RESULTS OF E-BIDDING AND E-RA FOR 2000 MW ISTS-CONNECTED WIND POWER PROJECTS (TRANCHE-III) Updated On Tue, Mar 27th, 2018 by Saurenergy /web-data/docs/SECI%20Wind%202000%20MW%20result%20website%20upload.pdf Read more