India’s Renewable Energy Sector is Still Primed for Growth: IEEFA Updated On Wed, Sep 23rd, 2020 by Saurenergy While the pace of renewable energy growth has slowed in India, positive outcomes in recent auctions suggest there remains plenty of appetite among domestic and foreign investors to build renewable infrastructure, according to a new IEEFA briefing note. Policy-related headwinds and a collapse in electricity demand due to the COVID-19 crisis have disrupted India’s renewable energy […] Read more
PepsiCo Announces Target for 100% Renewable Electricity by 2030 Updated On Tue, Sep 22nd, 2020 by Saurenergy PepsiCo has announced a new target to source 100 percent renewable electricity across all of its company-owned and controlled operations globally by 2030 PepsiCo has announced a new target to source 100 percent renewable electricity across all of its company owned and controlled operations globally by 2030 and across its entire franchise and third-party operations […] Read more
Vietnam’s new PDP Must Optimise Renewables and Avoid Fossil Fuel Lock-in Updated On Tue, Sep 22nd, 2020 by Saurenergy Implementing Vietnam’s soon-to-be-launched next Power Development Plan will ultimately depend on the country’s ability to mobilize more innovative sources of offshore financing, finds a new report by the Institute for Energy Economics and Financial Analysis (IEEFA). Vietnam is poised to launch Power Development Master Plan 8 (PDP 8) for the next decade featuring a timely departure from […] Read more
How World Record Low Solar Prices Moved Out of India Updated On Sat, Sep 19th, 2020 by Saurenergy Back in 2016, when Acme Solar surprised, nay, shocked everyone with a bid of Rs 2.44 per KwH at the newly launched solar auctions, everyone celebrated. It was believed that much like telecom, the era of lowest cost solar in India had also arrived. A long, sustained boom was duly predicted, and many of todays […] Read more
Renewables Rich Rajasthan can Lead India’s Energy Transition: IEEFA Updated On Fri, Sep 18th, 2020 by Saurenergy IEEFA finds that Rajasthan can play a key leadership role in India’s transition to a low-emission and low-cost electricity system. As India looks to expand its renewable energy capacity, a new report from IEEFA finds that Rajasthan can play a key leadership role in India’s transition to a low-cost, low-emission, profitable electricity system. The state’s installed […] Read more
With Right Investments, UK can Lead World to Net-Zero Goals: Report Updated On Thu, Sep 17th, 2020 by Saurenergy Wood Mackenzie has delivered a comprehensive roadmap for the North Sea’s future to the OGTC, setting out the critical technologies needed to deliver an integrated net zero energy system on the UK Continental Shelf (UKCS). Closing the Gap – Technology for a Net Zero North Sea produced by Wood Mackenzie for the OGTC, with support from […] Read more
SunAlpha Energy Enabling job Opportunities Post Lockdown 4.0 Updated On Wed, Sep 16th, 2020 by Saurenergy Atmanirbhar Bharat Abhiyan’ inspires one of the leading solar energy conglomerates in India to create jobs for professionals & labour in the industry The Covid-19 pandemic has brought the world to a standstill and has impacted our lives deeply. All sectors have been hit by the challenges caused by the outbreak of the virus strongly and […] Read more
UL Receives Accreditation to Test RE Plants in India per CEA Grid Codes Updated On Wed, Sep 16th, 2020 by Saurenergy UL has received accreditation from DAkkS that enables it to test renewable energy (RE) power plants per CEA of India grid codes. UL, a global safety science company, has announced that it has received accreditation from Deutsche Akkreditierungsstelle GmbH (DAkkS) that enables it to test renewable energy (RE) power plants per Central Electricity Authority (CEA) […] Read more
Gujarat Govt Revises Policy for Wasteland Allocation for RE Parks Updated On Tue, Sep 15th, 2020 by Saurenergy The state government of Gujarat has revised its policy for allocating wasteland for renewable energy i.e. wind, solar and hybrid (wind and solar) power parks. According to the new provisions, the renewable project/ park developer(s) will have a period of 3 years from the date of handing over of the sites to build a minimum […] Read more