GUVNL Issues Tender For 500 MW Non-Park-based Solar Power Projects Updated On Tue, Apr 19th, 2022 by Saurenergy Gujarat Urja Vikas Nigam Limited (GUVNL), the state electricity regulation board of Gujarat, has issued a Request for Selection (RfS) for procurement of power through Competitive Bidding from 500 MW Non-Park based Solar Power Projects with a Greenshoe option of an additional 500 MW. Prices are likely to be in the range of Rs 2.45 […] Read more
Simulink, MATLAB And The Smarter Digital Grids Of Tomorrow Updated On Tue, Apr 19th, 2022 by Saurenergy MATLAB, and Simulink are software products that every developer who has made software for use in the Renewable energy and EV space is familiar with. The firm behind these products, US based Mathworks, has built a whole suite of products to support data handling and more. We caught up with R Vijayalayan, who manages the […] Read more
THDC, Rajasthan Govt Sign Agreement to Develop 10,000 MW Solar Projects Updated On Mon, Apr 18th, 2022 by Saurenergy THDC India Limited has signed an agreement in Rishikesh with Renewable Energy Corporation Limited (RECL) for the development of large solar power projects with combined capacity of 10,000 MW in Rajasthan. With one of the highest solar irradiance in India, Rajasthan has been catching up aggressively in fresh solar capacity as well as planned capacity in […] Read more
Tata Power Renewables to get Rs 4,000 crore Investment from BlackRock, Mubadala Updated On Mon, Apr 18th, 2022 by Saurenergy Tata Power Renewable Energy Ltd has raised Rs 4,000 crore to build a comprehensive platform to achieve its renewable sector ambitions in India. In a statement filed with exchanges, it has shared that a binding agreement has been signed by Tata Power and the BlackRock Real Assets-led consortium under which BlackRock will invest in Tata […] Read more
Design engineer/ Assistant design Engineer Updated On Thu, Apr 14th, 2022 by Saurenergy As our new Ramboll Engineering Centre (REC) was established as a dedicated institution for creating the excellence centre in Ramboll. REC focusses on providing global expertise using local resources from India. Facilitates cooperation between India, business units in Europe and the Middle East specifically for the Buildings, Transport and Water sectors. This big team is […] Read more
Neoen Inks 70 MW virtual battery deal with AGL in Australia Updated On Thu, Apr 14th, 2022 by Saurenergy Paris-headquartered renewable energy producer Neoen has inked an innovative 7-year virtual battery agreement with AGL Energy, an Australian energy generator and retailer, to provide 70 MW / 140 MWh of virtual battery capacity in the New South Wales (NSW) region of Australia’s National Electricity Market. The offtake gives AGL Energy the ability to hedge its […] Read more
AuREUS Repurposes Food Waste Into Solar Panels Updated On Wed, Apr 13th, 2022 by Saurenergy Since sunlight is available for a limited period during the day, standard solar panels only generate power 15-20% of the time. This is a major hindrance in the widespread adoption of solar energy, which Carvey Ehren Maigue, from Mapua University, in Manila in the Philippines, is seeking to solve with his invention ‘AuREUS’ that simultaneously […] Read more
As Central Asia’s Fossil Fuels Near Expiry, Time To Look At Renewable Energy Updated On Tue, Apr 12th, 2022 by Saurenergy Kazakhstan, Uzbekistan, Turkmenistan, Tajikistan and Kyrgyzstan constitute Central Asia. Out of these, the former three are graced with petroleum resources, while the latter two are endowed with water resources. Electricity generation in these countries has, naturally, long relied on their richness in one or the other of the two resources. The downstream countries tend to […] Read more
Oriano Clean Energy to Develop 40MWp Solar Power Projects for Shree Cement Updated On Tue, Apr 12th, 2022 by Saurenergy Mumbai based clean tech company Oriano Clean Energy Private Limited has announced that it has secured an order from Rajasthan based Shree Cement Limited (SCL) to develop about 40 MWp of solar power projects under Captive Open Access Mechanism. The contract is specifically for the building of solar PV projects of 30 MWp (2 x […] Read more