UK’s Biggest Solar Corporate PPA Signed Between Vodafone, Centrica & MYTILINEOS Updated On Tue, Feb 21st, 2023 by Saurenergy Telecommunications firm Vodafone and Centrica, international energy services and solutions company, have entered into a second corporate Power Purchase Agreement (PPA). They have joined hands with MYTILINEOS S.A, a leading global industrial and energy company to facilitate the output from five solar farms that are in the works in England. These will cumulatively generate 216 […] Read more
The 5 Questions 2023 Could Answer for Renewable Energy in India Updated On Tue, Feb 21st, 2023 by Saurenergy India has over 174 GW of installed renewable capacity, including large hydropower at the conclusion of December 31, 2022. Solar power constituted the largest share of about 64 GW of the total. Wind power (41.9 GW), large hydro (46.85 GW), biomass/co-generation (10.2 GW), small hydro power (4.93 GW), and waste to energy with 0.52 GW […] Read more
India’s Renewable Energy Installation Stands at 168 GW, Coal-Based Power Grows 536 MW in a Year Updated On Thu, Feb 16th, 2023 by Saurenergy Central Electricity Authority has revealed in its installed electricity capacity report that the renewable energy capacity of the country has crossed 168 GW but the speed of the RE expansion doesn’t give out a comfortable picture considering India’s 2030 targets. The RE installed capacity of India as on January 31, 2023 stands at 168,399 MW. […] Read more
Switzerland Seeks To Adapt For Solar Energy With AlpinSolar Plant Updated On Thu, Feb 16th, 2023 by Saurenergy Switzerland, the rich alpine country with what many would consider limited solar potential, has certainly started trying harder. The AlpinSolar power plant on Lake Muttsee Dam in Switzerland has become the first in the country with 5,000 solar panels. The dam is 2,500 meters above sea-level and is surrounded by snow capped peaks. It is […] Read more
Chemical Giant Lanxess to Source Green Electricity from Engie Updated On Wed, Feb 15th, 2023 by Saurenergy Specialty chemicals player Lanxess has said that it has signed power full supply agreements with energy company Engie for a total of 1,400 GWh for sites in Germany and Belgium. Lanxess said that more than half will be covered by corporate power purchase agreements (cPPAs) with guarantees of origin for green power. The cPPAs run […] Read more
India’s Green Bond Market at Just 3.8 % of Overall Domestic Corporate Bond Market Updated On Mon, Feb 13th, 2023 by Saurenergy The green bond market in the country accounts for only 3.8 % of all outstanding corporate bonds exceeding USD 500 billion, say market reports. As per media reports, Fitch Ratings said that as of January 2023, GSSS (Green, Social, Sustainability and Sustainability-linked Debt) bonds accounted for USD 20 billion or 3.8 % of the country’s […] Read more
Australian Solar Developer’s Modular Solar Tech to Power Lithium Mine Project Updated On Wed, Feb 8th, 2023 by Saurenergy Australia based solar energy technology developer 5B has said that it will be partnering Zenith Energy to develop the Kathleen Valley Lithium project in Western Australia. The solar project will supply green energy to the biggest battery metals mines. The project will be powered by 5B Maverick technology- a ground mount solar solution designed to […] Read more
Adani Green Energy Q3 Results- Operational Capacity Up 35%, EBITDA 44% Updated On Tue, Feb 7th, 2023 by Saurenergy Embattled Adani group firm, Adani Green Energy Limited has reported its results for the Q3, Fy23. The firm, with a target of 25 GW of renewable assets by 2025, has reported a strong financial Performance, with revenue from power supply increasing by 39% YoY to Rs 3,695 Cr. The firm continued to lead in generation […] Read more
GUVNL Issues Tender For 500 MW Solar Power Projects Updated On Tue, Feb 7th, 2023 by Saurenergy Gujarat Urja Vikas Nigam Ltd. (GUVNL) has issued tender inviting bids for purchase of power through competitive bidding process [followed by reverse e-auction] from 500 MW grid connected solar photovoltaic power projects (Phase XIX) to be set up anywhere in India with greenshoe option of additional upto 500 MW. GUVNL tender puts the last date […] Read more