Average Rural Power Supply Duration has Increased to 18.5 Hours Updated On Fri, Mar 5th, 2021 by Saurenergy RK Singh has informed that the average rural power supply duration increased from 12.5 hours in 2014-15 to 18.5 hours in 2019-20. Addressing the Power Ministry Parliamentary Consultative Committee in a meeting, Power Minister RK Singh has informed that the average rural power supply duration increased from 12.5 hours in 2014-15 to 18.5 hours in […] Read more
BHEL Issues O&M Tender for 10 MW Solar Project in West Bengal Updated On Fri, Mar 5th, 2021 by Saurenergy BHEL has issued an O&M works tender for a 10 MW solar project in West Bengal at Santaldih. An Indian government undertaking, Bharat Heavy Electronics Limited (BHEL), has issued an operation and maintenance (O&M) works tender for West Bengal State Electricity Distribution Company’s 10 MW solar project at Santaldih. Interested Bidders including, micro, small, and […] Read more
White Pine Renewables Completes Largest Floating Solar Farm in the US Updated On Thu, Mar 4th, 2021 by Saurenergy White Pine Renewables has announced the completion of the Healdsburg Floating Solar Project, the largest such project completed in the US White Pine Renewables has announced the completion of the Healdsburg Floating Solar Project. The project will deliver clean energy to the City of Healdsburg, California, under a 25-year power purchase agreement (PPA). At 4.78 MW(dc) […] Read more
Nextracker Chosen to Supply Smart Solar Trackers for Brazil’s Largest Solar Power Plant Updated On Wed, Mar 3rd, 2021 by Saurenergy Leading Brazilian EPC Andrade Gutierrez to build 830 MW Janaúba PV plant in state of Minas Gerais using NX Horizon™ bifacial optimized solution Nextracker™, a Flex company, announced that it has been selected by leading Brazilian EPC firm Andrade Gutierrez and developer Elera Renováveis (formerly Brookfield Energia Renovável) to supply 830 MW of its world-leading solar tracker technology, […] Read more
Axial begins the supply and installation of 150MW of its AxialTrack Updated On Wed, Mar 3rd, 2021 by Saurenergy The company is kicking-off 2021 by carrying out an ambitious project that underlines its AxialTracker with Blocking System’s status as a safe and reliable solar tracking system. Axial has begun the supply and installation of its AxialTracker 2V system as part of a 150 MW project based in the Andalusian province of Granada in southern […] Read more
EDF Renewables Signs 100 MW Solar VPPA With Enterprise Products Updated On Wed, Mar 3rd, 2021 by Saurenergy EDF Renewables North America has announced a power purchase agreement (PPA) for the second tranche of the Space City Solar Project with an affiliate of Enterprise Products Partners for 100 MWac / 132 MWdc. The Project’s total capacity is up to 345 MWac / 455 MWdc. Space City Solar, located in Wharton County, Texas, is expected to commence […] Read more
The Hydrogen Roadmap to 2030. Updated On Tue, Mar 2nd, 2021 by Saurenergy Underpinned by a global shift of regulators, investors, and consumers towards decarbonisation, Hydrogen (H2) is receiving unprecedented interest and investments. And a new report developed collaboratively by the Hydrogen Council and McKinsey & Company, has tried to provide an overview of these developments in the hydrogen ecosystem. The report ‘Hydrogen Insights: A Perspective on Hydrogen […] Read more
Global Solar Capacity Set to Exceed 150 GW in 2021 Updated On Tue, Mar 2nd, 2021 by Saurenergy With an expected 150 GW of fresh solar capacity to be added in 2021, solar will continue to strengthen its place as the biggest contributor to fresh capacity additions worldwide in 2021. With almost 40 GW added in 2020, numbers that defied multiple predictions of hits from the Coronavirus pandemic, markets such as the US, […] Read more
Supervisor (Solar/Power System)/ (S-1 Grade) Job in SECI Updated On Tue, Mar 2nd, 2021 by Saurenergy Govt Jobs in renewable energy company solar energy corporation of India Ltd (SECI) Specification and Experience Candidate should have minimum 01 year of post-qualification experience in field of setting up of Solar / Wind / Hybrid Projects/ Power Generation/ Transmission. Qualifications: Diploma in Mechanical / Electrical / Civil Engineering. Age Limit: 32 Years No. of […] Read more