Nearly Rs 12,000 Crore Spent on RE Projects Over Last 3 Fiscals: RK Singh Updated On Mon, Sep 21st, 2020 by Saurenergy RK Singh has confirmed that nearly Rs 12,000 crore has been utilised for the development of RE projects in the country between 2017-18 and 2019-20. Union Minister for Power and New & Renewable Energy RK Singh has confirmed that nearly Rs 12,000 crore (Rs 11,787.69 crore) has been utilised for the development of renewable energy […] Read more
How World Record Low Solar Prices Moved Out of India Updated On Sat, Sep 19th, 2020 by Saurenergy Back in 2016, when Acme Solar surprised, nay, shocked everyone with a bid of Rs 2.44 per KwH at the newly launched solar auctions, everyone celebrated. It was believed that much like telecom, the era of lowest cost solar in India had also arrived. A long, sustained boom was duly predicted, and many of todays […] Read more
Verizon Prices Second Green Bond, to Fund Renewable PPAs Updated On Sat, Sep 19th, 2020 by Saurenergy Verizon Communications has announced the pricing of its second Green Bond offering which follows its recent completion of the allocation of its first. Verizon Communications has announced the pricing of its second Green Bond offering which follows its recent completion of the allocation of its first Green Bond and solidifies its position as a telecommunications industry leader in […] Read more
With Right Investments, UK can Lead World to Net-Zero Goals: Report Updated On Thu, Sep 17th, 2020 by Saurenergy Wood Mackenzie has delivered a comprehensive roadmap for the North Sea’s future to the OGTC, setting out the critical technologies needed to deliver an integrated net zero energy system on the UK Continental Shelf (UKCS). Closing the Gap – Technology for a Net Zero North Sea produced by Wood Mackenzie for the OGTC, with support from […] Read more
Visaka Industries Granted 20-year Patent Rights for ATUM Solar Roof Updated On Wed, Sep 16th, 2020 by Saurenergy Visaka Industries has been granted a 20-year patent for its ATUM Solar Roof, for the invention titled “Eco-Friendly Energy Generating Roof.” Visaka Industries Limited has been granted a 20-year patent for its ATUM Solar Roof. The patent has been granted for the invention titled “Eco-Friendly Energy Generating Roof.” ATUM is a roof that generates electricity. […] Read more
UL Receives Accreditation to Test RE Plants in India per CEA Grid Codes Updated On Wed, Sep 16th, 2020 by Saurenergy UL has received accreditation from DAkkS that enables it to test renewable energy (RE) power plants per CEA of India grid codes. UL, a global safety science company, has announced that it has received accreditation from Deutsche Akkreditierungsstelle GmbH (DAkkS) that enables it to test renewable energy (RE) power plants per Central Electricity Authority (CEA) […] Read more
Manufacturing Boosted by Low Tariffs Will Help Atmanirbhar Bharat: RK Singh Updated On Wed, Sep 16th, 2020 by Saurenergy RK Singh believes Lower tariffs will boost local manufacturing in the country, which in turn will contribute to achieving the goal of Atmanirbhar Bharat. Union Minister for Power and New and Renewable Energy RK Singh has said that the competitiveness of the Indian solar industry which has seen tariff drops to a record low will […] Read more
Vehicle-to-Grid Pilot Project Inaugurated in Turin, Italy Updated On Tue, Sep 15th, 2020 by Saurenergy FCA, ENGIE Eps and Terna have presented the pilot project Vehicle-to-Grid of electric mobility, which will become the biggest of its kind globally. FCA, ENGIE Eps and Terna have presented, within the Mirafiori FCA’s premises in Turin, the pilot project Vehicle-to-Grid (V2G) of electric mobility, which once totally completed, will become the biggest of its […] Read more
Gujarat Govt Revises Policy for Wasteland Allocation for RE Parks Updated On Tue, Sep 15th, 2020 by Saurenergy The state government of Gujarat has revised its policy for allocating wasteland for renewable energy i.e. wind, solar and hybrid (wind and solar) power parks. According to the new provisions, the renewable project/ park developer(s) will have a period of 3 years from the date of handing over of the sites to build a minimum […] Read more