Germany Puts A Stop To Landmark Renewables Levy On Consumer Power Prices Updated On Tue, Jul 5th, 2022 by Saurenergy Starting 1 July 2022, people will not have to pay from their own pockets directly via power bills for renewable energy generation in Germany, but from a state fund. This levy, that often accounted for one fifth of the consumer power price and 3.7 cents per kilowatt-hour, was paid for by households and businesses through […] Read more
IEX Power Trading Update for June 2022 Updated On Tue, Jul 5th, 2022 by Saurenergy The Indian Energy Exchange achieved 8267 MU volume in June ’22 comprising 7058 MU in the conventional power market, 536 MU in the Green Power Market, and 673 MU (6.73 lac Certificates) in the REC Market, registering 17% YoY volume growth across all market segments. Owing to improved supply-side availability, the prices at the day […] Read more
Application of Silicone Sealant in Solar Modules Updated On Tue, Jul 5th, 2022 by Saurenergy Introduction Solar module manufacturing appears to be quite simple, yet the performance and life cycle of the module depends on every individual part, whose effective coordination is expected to extend the durable life of solar module to 25 years or longer. Today, we look at solar sealant, perhaps the least noticed, but a critical and […] Read more
Project Lead Engineer – Power Quality Solutions Updated On Tue, Jul 5th, 2022 by Saurenergy Responsibilities:- Successful execution of Project/Tenders for STATIC VAR Compensator (SVC), STATIC Synchronous Compensator (STATCOM) and Series Compensation (SC) for Power Utilities across the globe. Executing project/tenders as project/tender, responsible for any engineering discipline (i.e. System, Mechanical, Electrical, Control). Evaluating risks and opportunities, strategizes mitigation of one’s engineering discipline. Ensuring that engineering activities are complied with […] Read more
Soren May Unveil New Jharkhand Solar Policy On July 5 Updated On Mon, Jul 4th, 2022 by Saurenergy An ambitious new solar policy is going to be unveiled by Jharkhand Chief Minister Hemant Soren on July 5 to increase clean energy capacity from 45 MW to 4,000 megawatts in the next five years and attract the investors. The Jharkhand Solar Policy, 2022 will encourage residential rooftop solar panels in cities besides a better […] Read more
Supply Chain Coordinator Updated On Fri, Jul 1st, 2022 by Saurenergy Responsibilities:- Act as the primary point of contact to all customers in the Regions for Spares & Tools Responsible for “Down Turbine” order management, communication, and results – High Urgency Participate in daily turbine down call, interface with Site managers and Service management Monitor delivery note creation and to the warehouse to ensure same day […] Read more
Lead Engineer – Design for Excellence Updated On Fri, Jul 1st, 2022 by Saurenergy Manufacturing Readiness Tower, Electrical & Simulation is part of the New Product Master department and has the responsibility of verifying the design of new Vestas’ WTG products including maturing the manufacturing for our serial producing factories. Responsibilities:- Create detailed technical scope document incorporating work breakdown structure (WBS), time estimations, budget requirement, Interdependencies, intended output results […] Read more
Irish Study Says Rooftop Solar Panels Can Produce 1/4 th Of Total Electricity Needed Updated On Fri, Jul 1st, 2022 by Saurenergy A quarter of total electricity needed by Irish households can be produced by installing solar panels on the domestic rooftops. Conducted by the climate scientists at University College Cork, Ireland, this was the conclusion of the study after the team had thoroughly examined every rooftop in the country using satellite imagery and weather data for […] Read more
Vestas Secures 86 MW & 39 MW Orders in USA & Estonia Updated On Thu, Jun 30th, 2022 by Saurenergy Wind turbine manufacturer, Vestas has secured two wind project in USA & Estonia with the respective capacity of 86 MW & 39 MW. For the 86 MW Project Sacramento Municipal Utility District (SMUD) has given Vestas an 86 MW order to repower the Solano Wind Project Phase 4 wind farm in California, USA. The site’s […] Read more