Green Stocks Mar 11: Green Stocks Fail To Benefit From Rebound Updated On Tue, Mar 11th, 2025 by Saurenergy On a day when the key indices, as well as the broader mid cap index rose, most green energy stocks failed to catch the wind, so to say. NTPC Green, Borosil Renewables, Suzlon, SJVN and Premier Energies were just about able to eke out some gains, even as the rest slipped, and in some cases, […] Read more
Rajasthan’s Cumulative Power Generation Crosses 10 GW Updated On Tue, Mar 11th, 2025 by Saurenergy Rajasthan’s Minister of State for Energy (Independent Charge) Hiralal Nagar said that the state’s cumulative power generation has crossed 10 GW. The minister shared the data while speaking before the Rajasthan Legislative Assembly. The minister said that this capacity came through all possible sources of fuels. He also said that the peak hour demand for […] Read more
Madhya Pradesh Issues PHS Policy To Add 12 GW Of 4-Hour ESS Updated On Tue, Mar 11th, 2025 by Saurenergy Madhya Pradesh requires 29,956 MW of solar and 5,293 MW of wind capacity by 2034-35 to meet its energy demand. Under the CEA’s resource adequacy plan for Madhya Pradesh, it projects a 5.36% compound annual growth rate (CAGR) in energy capacity from 2024-25 to 2034-35 to meet state power needs. Madhya Pradesh’s recent scheme for […] Read more
CERC Proposes New Changes In GNA Rules To Boost RE Updated On Mon, Mar 10th, 2025 by Saurenergy The Central Electricity Regulatory Commission (CERC) has now issued a new draft regulation on General Network Access (GNA). With this proposed fourth amendment in the regulations, the regulatory body has planned to enhance grid stability and boost renewable energy. The central agency has now proposed imposing a new regulation for entities with restricted access. It […] Read more
Juniper Green’s Solar Project To Supply Power To Bhutan Updated On Mon, Mar 10th, 2025 by Saurenergy Juniper Green Energy today announced the successful commissioning of its 100 MW solar project. The project is set to supply cross-border electricity to Bhutan. This achievement marks the company’s first merchant plant, the company said. The project facilitates an important cross-border power agreement, aiming to provide 50% of the power generated to Bhutan during the […] Read more
Australia Set for Solar With 8 Hour BESS Backup Updated On Mon, Mar 10th, 2025 by Saurenergy Australian Infrastucture investor Quinbrook Infrastructure Partners, has announced plans to pioneer a global market first in advanced long duration energy storage solution developed in a technical collaboration with CATL, the world’s leading battery energy storage system (BESS) manufacturer. The groundbreaking storage solution, believed to be the world’s first genuine 8-hour battery at more than double […] Read more
Herbicide Use in Solar Parks Poses New Ecological Risks Updated On Mon, Mar 10th, 2025 by Saurenergy By-Gowthami Subramaniam When a 40-acre solar park came up in Tamil Nadu’s Tiruppur district last year, residents of a colony bordering the solar park, were unaware of the potential consequences. Now, they are increasingly troubled by the strong smell and possible health risks of herbicides that the park is using for weed control. “We smell […] Read more
All Women Team From Apraava Breaks New Ground By Running 100 MW Solar Plant Updated On Fri, Mar 7th, 2025 by Saurenergy In a significant stride towards advancing Diversity, Equity, and Inclusion (DEI), Apraava Energy put together an all women team to manage the morning shift operations at its 100 MW Veltoor solar plant in Telangana. The women did a more than competent job, driving home the possibility of more diversified hiring in the sector for other […] Read more
Assistant Manager- Module Process Updated On Fri, Mar 7th, 2025 by Saurenergy Responsibilities:- Responsible for improving lamination quality of the modules by meeting the lamination product /process CTQ’s. Stringer & laminator Recipe settings & troubleshooting. Documentation for new processes, WI, SOP, Process parameters Preparation of Pre lam EL data and rework monitoring and take corrective and preventative action for controlling Pre El rework. Coordinate with quality team […] Read more