SJVN, Hero Future Energies Sign PPA For 120 MW AP Solar Project Updated On Wed, May 15th, 2024 by Saurenergy SJVN Limited (SJVN), an Indian Public Sector Undertaking (PSU), recently signed a Power Purchase Agreement (PPA) with Hero Future Energies. The company singed this agreement with SJVN Limited for a 120 MW Firm and Dispatchable Renewable Energy (FDRE) project to be developed in Andhra Pradesh. Under the agreement, the project is expected to be commissioned […] Read more
Lead Engineer – Module Technical Lead Updated On Wed, May 15th, 2024 by Saurenergy Responsibilities:- You will be taking End to End ownership of delivering the Low Voltage Electrical package [from concept to final product validation] in the project according to Vestas execution model You will be the primary point of contact to handle and deliver the technical solution across the modules and product leads, having a close collaboration […] Read more
Engineer – LV Cable Design Updated On Wed, May 15th, 2024 by Saurenergy Responsibilities:- Ownership of assigned components / products within control and auxiliary power Create or Update of technical purchase specifications for LV switchgear and LV cables & Control cables Create or Update of technical purchase specifications for Junction Boxes, socket outlets Create and maintain Electrical documentations like panel layout, electrical diagrams etc Create or Update Service […] Read more
With The Rise Of RE, India’s New Coal Capacity Sees Record Drop: Report Updated On Wed, May 15th, 2024 by Saurenergy A latest report by the Institute for Energy Economics and Financial Analysis (IEEFA) said that renewable energy accounted for 71.5% of the record 13,669 megawatts (MW) power generation capacity added by India in the first quarter (Jan-Mar) of this year (2024), while coal’s share (including lignite) of total power capacity dropped below 50% for the first […] Read more
US Utility Solar Capacity Crosses 100 GW Updated On Wed, May 15th, 2024 by Saurenergy The American Clean Power Association (ACP), in its quarterly report for the US states that 2024 has begun on a strong note with Q1 seeing U.S. utility-scale solar, wind, and storage sectors adding a combined 5,585 megawatts (MW) of new capacity.This is an increase of 28% compared to installations in the same period a year […] Read more
Grid Optimization: Heimdall Power’s Magic Balls Make A Mark Updated On Wed, May 15th, 2024 by Saurenergy As our energy demands evolve and renewable sources become increasingly integrated into our power networks, the need for innovative solutions to optimize grid performance has never been more pressing. Especially with higher injections of variable renewable energy, grid optimisation has never been more important. The new form of cutting-edge technologies, from advanced sensors and smart […] Read more
Amplus Commissions 73.4 MWp Open Access Solar Plant In Jhansi Updated On Tue, May 14th, 2024 by Saurenergy Amplus, has announced the successful commissioning of its 73.4 MWp Project Lakshmi, an intra-state open-access solar plant in Jhansi, Uttar Pradesh. Project Lakshmi marks Amplus’s third solar open-access plant in Uttar Pradesh, following the success of Project Mirza and Project Deoria. This latest milestone elevates Amplus’s operational open-access capacity in Uttar Pradesh to over 200 […] Read more
EU To Withdraw From Probe Into Chinese Solar Park Construction Updated On Tue, May 14th, 2024 by Saurenergy Earlier this year, the United States (US) and European Union (EU) Commission announced launching an inquiry into Chinese suppliers of wind turbines under the new Foreign Subsidies Regulation. This announcement came as Chinese wind turbine manufacturers pushed hard and won some orders in Europe. The Chinese suppliers offered cheap turbines and generous finance which distorts […] Read more
HPCL Issues 300 MW EPC Tender For Solar Projects Updated On Tue, May 14th, 2024 by Saurenergy Hindustan Petroleum Corporation subsidiary HPCL Renewable and Green Energy (HPRGEL) has issued a tender inviting bids for 300 MW of interstate transmission system (ISTS)–connected solar power projects in seven states. The tender pertains to the engineering, procurement, and construction (EPC) package. The last day to submit the bids is May 30, 2024, and the bids […] Read more