Plant Electrical Maintenance – Diversity Updated On Mon, Apr 1st, 2024 by Saurenergy Equipment Maintenance Conduct regular inspections, troubleshoot, repair, and perform preventive maintenance on factory electrical systems, machinery, and equipment to ensure operational reliability and safety. Electrical Troubleshooting Diagnose and resolve electrical faults, malfunctions, and breakdowns in a timely manner to minimize production downtime and maintain quality standards. Safety Compliance Ensure that all electrical systems and installations […] Read more
EDP Renewables & Walmart Sign 15-yr PPA For 180 MW Texas Solar Plant Updated On Wed, Mar 27th, 2024 by Saurenergy EDP Renewables North America LLC and Walmart Inc. have signed a 15-year power purchase agreement (PPA) for a portion of a new 180-megawatt (MWac) solar project in Texas. Under the PPA, Walmart will be an offtaker for 162 MWac, complementing its current corporate procurement from EDPR NA projects of 233 MWac of utility-scale solar and […] Read more
J&K Forms Committee To Implement 12 Crore RE Projects Updated On Fri, Mar 15th, 2024 by Saurenergy The Jammu and Kashmir (J&K) government recently constituted an appraisal committee for renewable energy projects in the state. As per its recent order, the government sanctioned the constitution of the Technical Appraisal Committee (TAC). This TAC was formed for the implementation of renewable energy projects worth more than 12 crores. These projects are expected to […] Read more
India’s Solar Capacity Crosses 75 GW, Says Latest CEA Report Updated On Thu, Mar 14th, 2024 by Saurenergy The latest data on renewable energy capacity additions released by the Central Electricity Authority (CEA) said that India’s total installed capacity of solar power crossed 75 GW. The data from the government entity said that in the initial two months of 2024, India added a total of 2,257 MW of solar power. The additions are […] Read more
NTPC REL Secures 225 MW Project Bid In GUVNL’s Solar Projects Updated On Mon, Mar 4th, 2024 by Saurenergy NTPC REL has announced that it has secured a bid for a 225 MW solar PV power project in GUVNL’s 1125 MW grid-connected Solar PV power projects. Taking to X, formerly Twitter, NTPC REL announced that it has secured a bid for a 225 MW solar project. The press statement by the company, ” NTPC […] Read more
ReNew In Talks With Sembcorp To Sell 350 MW Assets: Report Updated On Fri, Mar 1st, 2024 by Saurenergy According to several media reports, Indian renewable energy company ReNew Energy Global Plc has initiated discussions to sell a portfolio of solar projects with a combined capacity of 350 MW to Singapore’s Sembcorp Industries Ltd The reports also said that earlier ReNew had sought to sell off a much larger 1.1-GW portfolio which included 750 […] Read more
Sr. Rotor Performance Engineer Updated On Thu, Feb 29th, 2024 by Saurenergy Roles and Responsibilities:- Wind turbine performance (AEP) modeling for a wind farm. Analysis of field data for wind turbine performance validation. Wind turbine performance (AEP) optimization for a wind farm. Development of tools and methods to enhance our analysis and validation capabilities. Must Have Qualifications:- Master or Ph.D. in Aerospace/Mechanical engineering with Aerodynamics or Wind […] Read more
NTPC Invites Bids For 2GW ISTS Solar Project in Barmer Updated On Mon, Feb 26th, 2024 by Saurenergy NTPC Renewable Energy has issued a tender inviting bids to develop 2 GW interstate transmission system (ISTS)-connected solar power projects in Barmer, Rajasthan. The tender is regarding land and power evacuation packages to build the ISTS solar project. The last date to submit the bids is March 28 and bids will be opened on the […] Read more
NTPC Invites Bids For 1500 MW ISTS Solar Projects Updated On Wed, Feb 14th, 2024 by Saurenergy NTPC has issued a tender inviting online bids from eligible bidders on single stage two envelope with reverse auction for the selection of solar power generators for setting up of 1500 MW ISTS-connected solar power projects across India. As per the tender document by NTPC, the technical bid will open on March 5 while the […] Read more