RE Supply Shift Poised To Favor North And South India Over West By 2032: SBI Caps Report Updated On Fri, Nov 29th, 2024 by Saurenergy India added 30 GW to its installed base (net basis) in the past 12 months, of which 75% was renewables, according to the latest data released in the SBI Caps report. Renewable energy has made notable progress recently, driven by fresh wind additions and a surge in energy storage system (ESS) tenders, as noted in […] Read more
Green Stocks Nov 26: Weak Market, Weaker Green Stocks Performance Updated On Tue, Nov 26th, 2024 by Saurenergy As the market struggled to find a decisive direction today, our green pack had problems of its own. The biggest green developer, Adani Green Energy continued it’s slide into new depths, cracking past Rs 900 after news that JV partner Total Energies would be pausing further investments till clarity emerges on the US indictments. The […] Read more
NTPC Green Floats JV To Set Up RE Projects In Andhra Pradesh Updated On Fri, Nov 22nd, 2024 by Saurenergy NTPC Green Energy Ltd. (NGEL), a subsidiary of NTPC, has entered into a joint venture (JV) with the New & Renewable Energy Development Corporation of Andhra Pradesh (NREDCAP) to develop renewable energy projects in Andhra Pradesh. This collaboration is poised to attract an investment of ₹2,00,000 crore to the state. The JV will spearhead the […] Read more
Senior Engineer-Stores Cell Updated On Fri, Nov 22nd, 2024 by Saurenergy Assist in timely receipt of all incoming material, inward inspection, proper storage and preservation, Identification and traceability, Inventory management, accounting and issuing the materials to production on time as per the requirements. Liquidation of scarp & hazardous material as per defined guidelines. Responsibilities:- Must be aware of inward process of incoming raw material/quality clearance/Insurance claim […] Read more
Senior Engineer- Solar Asset Management Updated On Fri, Nov 22nd, 2024 by Saurenergy Should have sound knowledge on basic principles of Electrical Components. Preparation of various documents as per ISO standards. Experience in problem solving by using tools like Root Cause Analysis, Corrective Action & Preventive Action process. Raising Non-Conformities, conducting RCA, CAPA and tracking closure of NCs for timely completion. Supervising and verifying preventive maintenance as per […] Read more
Avaada Signs MoU To Develop 1200 MW of PSP In Rajasthan Updated On Fri, Nov 22nd, 2024 by Saurenergy Indian renewable energy conglomerate Avaada Group has entered into a Memorandum of Understanding (MoU) with the Rajasthan government to develop a 1200 MW Pumped Storage Project. The MoU, formalized between the Energy Department of the Rajasthan government and Avaada Aqua Batteries Pvt. Ltd., a subsidiary of Avaada Group marks the next chapter in Avaada’s investment […] Read more
Green Stocks Nov 22: Market Rebounds, Green Stocks Trail Updated On Fri, Nov 22nd, 2024 by Saurenergy For once, a strong day at the markets left Green Stocks behind. Of course, not all stocks were left behind, as Waaree Renewable Technologies, after a couple of weeks in relative obscurity, shone with a 5% jump. A surprising performance came from Shakti Pumps, which gave up most gains of the week to end over […] Read more
CY24: India Adds 18.8 GW Of Solar Capacity In 10 Months Updated On Mon, Nov 18th, 2024 by Saurenergy India’s total installed solar energy capacity has now surpassed 92 GW, according to the latest data from the Central Electricity Authority (CEA). The CEA’s most recent monthly installed capacity report revealed that the country added 1,717.36 MW of new renewable energy capacity (excluding large hydro) in October 2024. The report further indicated that India’s total […] Read more
Equinix, CleanMax Ink 33 MW Captive Project Deal in Maharashtra Updated On Thu, Nov 14th, 2024 by Saurenergy Equinix, Inc., a digital infrastructure company today signed a Power Purchase Agreement (PPA) with CleanMax, a renewable energy provider in the Commercial and Industrial (C&I) sector and a Brookfield-backed company. Under the agreement, the parties plan to collaborate to build a 33 MW Captive Power Plant in Maharashtra. This partnership intends to provide renewable energy […] Read more