The Return of Reverse Auctions For Wind Energy- Bad News Or Normalcy? Updated On Tue, Mar 5th, 2024 by Saurenergy Read more
The Return of Reverse Auctions For Wind Energy- Bad News Or Normalcy ? Updated On Tue, Mar 5th, 2024 by Saurenergy Following reports that the government has instructed leading PSU energy developers to return to the reverse auction mechanism for wind energy tenders, SaurEnergy tried to check the veracity of the claim. Without coming on record, it appears that a communication has been sent to that effect, to NTPC, SJVN, NHPC and of course SECI, which […] Read more
Vestas Secures 153 MW Wind Energy Order In US Updated On Tue, Feb 27th, 2024 by Saurenergy Renewable energy company Vestas received a 153 MW order to power an undisclosed wind project in the USA. The order consists of 34 V150-4.5 MW wind turbines. The orders include supply, delivery, and commissioning of the turbines, as well as a multi-year Active Output Management 5000 (AOM 5000) service agreement, designed to ensure optimized performance […] Read more
JUNIPER, Envision Collaborate To Develop Wind Energy Project In Gujarat Updated On Tue, Feb 20th, 2024 by Saurenergy Juniper Green Energy a renewable energy power producer company and Envision Energy a green technology company have inked an agreement for the development and delivery of Wind Turbine Generators (WTGs). The turbine has a total capacity of 300 megawatts (MW) located in Devbhoomi Dwarka District, in the State of Gujarat. As per the partnership, Envision […] Read more
TotalEnergies, European Energy Expand Their Collaboration In Wind Energy Updated On Tue, Jan 23rd, 2024 by Saurenergy TotalEnergies, a multi-energy company, announced its collaboration with European Energy, which develops and constructs renewable energy projects. It recently signed a new agreement with European Energy to develop offshore wind projects in three Nordic countries: Denmark, Finland and Sweden. This collaboration forms a part of its integrated development in electricity. 405 MW of offshore wind […] Read more
Bim Engineer Tekla Offshore Wind Energy Updated On Tue, Jan 16th, 2024 by Saurenergy Creating 3D BIM models in Tekla Steel for offshore wind WTG Foundation structures, such as monopiles, jackets, transition pieces, boat landings, internal platforms, work platforms, and other structures. In charge of creating top-notch 3D models from which to extract 2D drawings. Contributing to the creation of intricate connection drawings, MTOs In charge of conducting a […] Read more
Specialist Secondary Steel Structural Design Offshore Wind Energy Updated On Tue, Jan 16th, 2024 by Saurenergy Designing offshore steel structures/topsides for conceptual and detailed design projects, with a focus on offshore wind in compliance with project specifications. Preparing analytical models, computations, reports, specifications, etc., and ensuring designs are prepared to fulfill the latest health and safety requirements for offshore wind foundation design, from fabrication through to decommissioning. Designing the secondary steel […] Read more
EU Adds 17 GW New Wind Energy In 2023, Fails To Meet 30 GW Target Updated On Mon, Jan 15th, 2024 by Saurenergy A latest data by WindEurope found that European Union (EU) built 17 GW of new wind farms in 2023. The report also said that the EU installed 14 GW of onshore and 3 GW of offshore wind energy. The EU report stated, “These numbers are slightly up on 2022 and are the most the EU has ever built […] Read more
Wind Energy Takes Centre Stage at COP28 Updated On Tue, Dec 5th, 2023 by Saurenergy COP28, being held in Dubai, has served as an ideal platform seeing major wind firms and countries join hands on noteworthy agreements on the setting up of wind farms. These agreements run into several gigawatts. 1 GW TotalEnergies AoI On the COP28 platform, French firm, TotalEnergies has entered into an agreement on investment (AoI) with […] Read more