MNRE circulates draft Indian Wind Turbine Certification Scheme (IWTCS) Updated On Tue, Nov 13th, 2018 by Saurenergy Ministry of New and Renewable Energy, in consultation with National Institute of Wind Energy Chennai, has prepared a draft of new Scheme called Indian Wind Turbine Certification Scheme (IWTCS) incorporating various guidelinesTurbine Certification Scheme (IWTCS). The IWTCS is a consolidation of relevant National and International Standards (IS/IEC/IEEE), Technical Regulations and requirements issued by Central Electricity […] Read more
“The Transformation of Energy System is not Going to Happen Overnight and We Should all Participate in it!” LONGi Chairman Zhong Baoshen Appeals to The Public Updated On Tue, Nov 6th, 2018 by Saurenergy The application of clean energy and vigorous development of energy storage technology provide us with a new way of life: we can enjoy eco-friendly and low-cost energy without sacrificing the quality of life. At present, the global energy structure is accelerating to the direction of low carbon and carbon free. The transformation represented by new […] Read more
Fourth Partner Energy Commissions 980 kWp Rooftop Solar Carport for ŠKODA AUTO’s production facility in Aurangabad Updated On Tue, Nov 6th, 2018 by Saurenergy Fourth Partner Energy, India’s leading distributed solar energy company has commissioned a 980-kWp carport for ŠKODA AUTO India Private Ltd. at their manufacturing facility in Aurangabad, Maharashtra. This initiative, built in line with the ‘GREEN FUTURE’ strategy of ŠKODA AUTO and commissioned as part of the ‘INDIA 2.0’ project, is expected to reduce 922 tons […] Read more
What to Expect from India’s National Energy Storage Mission Updated On Thu, Nov 1st, 2018 by Saurenergy Solar power with its inherent limitation of being available only during day time and the influence of weather conditions, has made batteries an integral part for all PV systems. Increasing solar power injection makes grid stability and management issues a concern. As India is moving rapidly towards an energy and transportation transition, the need to […] Read more
CMI Inaugurates MiRIS: Europe’s Largest Industrial Energy Storage Pilot Plant Updated On Tue, Oct 30th, 2018 by Saurenergy MiRIS Project investigates energy storage, PV, and microgrid integration and optimization CMI Energy’s MiRIS project will be integrated with the CMI Group’s headquarters complex to allow its engineers to perform detailed analysis of renewable integration with energy storage CMI Energy, part of CMI Group, will be inaugurating Europe’s largest industrial energy storage facility on October 26, […] Read more
Results of E-Bidding and E-RA for 1200 mw ISTS-Connected Wind Power Projects (Tranche-v) Updated On Sat, Oct 27th, 2018 by Saurenergy SOLAR ENERGY CORPORATION OF INDIA LIMITED Selection of 1200 MW ISTS-connected Wind Power Projects (Tranche-V) (RfS No: SECI/C&P/WPD/1200MW/T5/RfS/022018 dated 30.06.2018) After Technical Bid Opening After e-Reverse Auction (held on 25.09.2018) Sl. No. Bidder’s Name Capacity (MW) Bidder’s Name Bidder’s Quantity (MW) Tariff (INR/kWh) Awarded capacity (MW) 1 Alfanar Company 300 Torrent Power Limited 115 2.76 […] Read more
Amendment – 4 : RFB for 160 mw Solar-Wind Hybrid Power Plant with Bess at Ramagiri, AP, India Updated On Sat, Oct 27th, 2018 by Saurenergy Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India Project: Innovation in Solar Power and Hybrid Technologies Project Contract title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 160 MW Solar-Wind Hybrid Power Plant with BESS including 10 Years Plant O&M under International competitive bidding at Ramagiri, Anantapur district, Andhra Pradesh, India RFB […] Read more
US Wind Turbine Market to be Driven by Decarbonization Targets and Favorable Regulatory Directives Updated On Fri, Oct 26th, 2018 by Saurenergy Global wind turbine market players recently witnessed a path-breaking announcement by energy giant GE, regarding the deployment of the most powerful offshore wind turbine called the Haliade-X in 2021. The deployment of the 12-megawatt wind turbine is expected to put GE in the leading position in the offshore wind turbine market as the new wind […] Read more
Egypt Could Meet Over 50% Electricity Demand via Renewable Energy: IRENA Updated On Wed, Oct 24th, 2018 by Saurenergy The Egypt Renewable Energy Outlook report finds that pursuing higher shares of renewable energy could reduce the country’s energy bill by up to USD 900 million annually in 2030. Egypt has the potential to generate up to 53 per cent of its electricity from renewable sources by 2030, according to a new report by the International Renewable Energy Agency (IRENA). The Egypt Renewable Energy Outlook report finds that pursuing higher shares […] Read more