JinkoSolar Cells and Module Set New Record For Cell Efficiency and Output Updated On Tue, Jun 4th, 2019 by Saurenergy JinkoSolar has revealed that its cheetah size cells and N-type cells reached 24.38% and 24.58% efficiency, respectively, and its 72-monocrystalline module reached 469.3W output. JinkoSolar, one of the largest solar module manufacturers in the world, has announced that the maximum conversion efficiency of its cheetah size cells and N-type cells reached 24.38% and 24.58%, respectively, during […] Read more
Mahindra Susten and Mitsui to Co-Develop Solar Plants in India Updated On Tue, Jun 4th, 2019 by Saurenergy Mahindra Susten and Mitsui have announced plans to co-develop and operate solar power projects in India. Mahindra Susten, the renewable energy arm of the Mahindra group, has announced entering into a partnership with Japan-based Mitsui & Co to jointly develop and operate solar power generation projects in India. A player in the Indian solar energy […] Read more
SECI’s 100 MW Solar Tender For SCCL Extended and Amended Updated On Tue, Jun 4th, 2019 by Saurenergy The last date for bid submission for the SCCL tender has been extended till June 10, 2019, and the techno-commercial bids will be opened on the same date. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its SCCL tender for the Design, Engineering, Supply, Construction, Erection, Testing & […] Read more
SECI Extends Deadline For 2 GW Solar Projects Tender Under CPSU-II Updated On Tue, Jun 4th, 2019 by Saurenergy The deadline bid submission has been extended by SECI till July 2, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for selection of solar power developers for setting up of 2000 MW grid-connected solar PV power projects in India (Tranche-I) under CPSU Phase-II scheme (Government Producer Scheme). The […] Read more
Kenya’s 1st Utility Scale IPP Solar Proj to Kick-off Construction Post Financial Close Updated On Mon, Jun 3rd, 2019 by Saurenergy Meanwhile, it is expected that the plant will reach commercial operation in mid-2020 as the construction work likely to take around twelve months. With an aim to power Africa’s growth trajectory, Globeleq is mulling to begin the construction of Kenya’s one of the first IPP-owned utility scale solar power plants post the financial close. This 40 […] Read more
ISA Invites Bids For Development of Solar PV Projects in Member Countries Updated On Mon, Jun 3rd, 2019 by Saurenergy The International Solar Alliance (ISA), a treaty-based inter-governmental organisation which specialises in implementing programmes in the field of solar energy has invited bids for the development of solar PV projects including rooftop PV solar capacity in its member countries. The organisation issued a call for bids after receiving a proposal from state-owned power generator NTPC […] Read more
LONGi Solar Unveils New Module Encapsulation Technology Updated On Mon, Jun 3rd, 2019 by Saurenergy The Seamless Soldering technology, when combined with innovative module design, has the potential to push the company’s high-efficiency PERC module power record to 500Wp. Chinese solar PV major, LONGi Solar has announced that the company has developed the technology of “Seamless Soldering”, which completely eliminates the gap between cells and increases the efficiency of PV modules. […] Read more
US Ends Preferential Trade Treatment, Solar Exports From India to Bear 25% Safeguard Duty Updated On Mon, Jun 3rd, 2019 by Saurenergy The decision is set to put additional tariffs burden of over $300 million on the American businesses every year, including solar exports from India which are expected to incur a safeguard duty of 25 percent. In a major blow to India’s newly elected government, the Trump administration has terminated India’s designation as a beneficiary developing […] Read more
Solar Packs To Reach Over 300 Van Gurjars’ Families in UP Reserve Updated On Mon, Jun 3rd, 2019 by Saurenergy As many as 391 Van Gurjars families residing in Amangarh area of Uttar Pradesh will get solar power packs as logistic problem does not allow them to have access to electricity by conventional means. According to officials, each power pack costs Rs 47,000 and will be provided to each Van Gurjar family under PM Saubhaagya […] Read more