CIT Leads $217 Mn Financing for 200 MW Solar Project in Ohio Updated On Tue, May 12th, 2020 by Saurenergy The CIT group’s Power and Energy unit served as lead arranger on a USD 217 million financing for the 200 MW Hillcrest solar PV project in Brown County, Ohio The CIT group has announced that its Power and Energy unit served as lead arranger on a USD 217 million financing for the 200-megawatt (MW) Hillcrest solar photovoltaic project in Brown County, Ohio. The financing was […] Read more
SECI to Organize Stakeholders Consultation Meet for 100MW Solar + BESS Project in Chhattisgarh Updated On Mon, May 11th, 2020 by Saurenergy Nodal agency the Solar Energy Corporation of India (SECI) will be organizing an online stakeholder’s consultation meeting in the state of Chhattisgarh for solar plus battery energy storage system (BESS). The meeting will be with respect to SECI’s upcoming project for the designing, engineering, supplying, construction, erection, testing and commissioning of 100 MW (AC) solar […] Read more
PGCIL Issues Statcom Package-I & II Tenders for Evacuating 8.1 GW Solar Energy in R’sthan Updated On Mon, May 11th, 2020 by Saurenergy State-owned Maharatna company Power Grid Corporation of India Ltd (PGCIL) has floated a tender for Statcom Package-I & II for the evacuation of 8.1 GW of power from solar energy zones in Rajasthan. The PGCIL described in a tender document for package-I as “Statcom Package-I for Statcom at 400kV Fatehgarh-II PS associated with transmission system […] Read more
NALCO Tenders for Room Construction for Rooftop Solar Batteries in Damanjodi Updated On Mon, May 11th, 2020 by Saurenergy State-owned National Aluminium Company Ltd (NALCO) has floated a tender for the construction of room for batteries of rooftop solar units at the premises of its D.M. plant in S.P.P, NALCO, Damanjodi in Odisha. The scope of work includes the construction of room for batteries of rooftop solar units; dismantling of PCC, RCC and tar […] Read more
Indian Oil Tenders for 150 kW Solar System in UP Updated On Mon, May 11th, 2020 by Saurenergy The Indian Oil Corporation (IOCL) has issued a tender for the commissioning of a solar power system at the firms’ LPG bottling plant in Kanpur, UP. The Indian Oil Corporation (IOCL) has issued a tender for the commissioning of a solar power system at the firms’ LPG bottling plant in Kanpur, UP. The scope of […] Read more
Domestic Solar Manufacturing Could Benefit From Pandemic Updated On Mon, May 11th, 2020 by Saurenergy Supply disruption from China and the decline in domestic solar capacity addition due to the pandemic offers a golden opportunity to local solar manufacturing The supply disruption from China due to the COVID-19 pandemic and subsequent decline in domestic solar capacity addition offers a golden opportunity to ramp up local manufacturing of solar modules and […] Read more
SECI Discovers Rs 2.90/kWh Tariff in 400 MW Round-The-Clock RE Tender; ReNew Power Emerges as Winner Updated On Fri, May 8th, 2020 by Saurenergy State-owned Solar Energy Corporation of India (SECI) has discovered a tariff of Rs 2.90/kWh in its tender for Round-The-Clock’ (RTC) supply of 400 MW renewable energy (RE) power to NDMC, New Delhi, and Dadra & Nagar Haveli. ReNew Power has emerged as the winner under this tariff-based competitive bidding (RTC-I) and won complete 400 MW of […] Read more
Tender Issued for Centralised Monitoring Tool for NTPC’s 250MW Mandsaur Solar Plant Updated On Fri, May 8th, 2020 by Saurenergy State-owned NTPC, country’s largest energy conglomerate, has floated tender for centralised monitoring analytical tool for its 250 MW Mandsaur solar photovoltaic (PV) plant for a period of six months. Further, the last date and time for bid submission is May 18, 2020, at 3:00 p.m. and the bid opening date is May 20, 2020, at 3:00 […] Read more
BHEL Tenders for Type Testing of Solar PV Modules as per IEC & IS Standards Updated On Fri, May 8th, 2020 by Saurenergy State-owned Bharat Heavy Electricals Ltd (BHEL) has floated tender inviting bids for type testing of solar photovoltaic (PV) modules as per IEC & IS standards. Interested bidders can submit their bids starting from May 08, 2020, after 02:00 p.m., and the last date for submitting bids is May 30, 2020, till 02:00 p.m. Also, the […] Read more