Gautam Solar On Course To Install 2500 Solar Pumps in Haryana Updated On Wed, Aug 25th, 2021 by Saurenergy New Delhi-based solar power equipment manufacturer Gautam Solar has installed 1,500 solar pumps at various locations in Haryana under the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) scheme, as per the company’s press release. While the company had installed 1,000 solar pumps in Haryana by May 2021, by August, the company won an […] Read more
TPREL Commissions 150 MW Solar Project in Rajasthan Updated On Tue, Aug 24th, 2021 by Saurenergy Tata Power Renewable Energy Ltd. (TPREL), a wholly-owned subsidiary of Tata Power, has commissioned a 150 MW solar power project in Loharki, a village in Rajasthan. Spread across 756 acres of land, this plant is expected to generate more than 350 million units annually. Approximately 656,700 modules were used in the project, and the installation […] Read more
AEML Supports MNRE’s Rooftop Solar Prog to Help Consumers Go Green Updated On Tue, Aug 24th, 2021 by Saurenergy Adani Electricity Mumbai Limited (AEML), in partnership with the Ministry of New and Renewable Energy (MNRE), is driving grid- connected rooftop program for its residential and housing society customers, who will get up to 40% subsidy on the project cost as a central financial assistance from MNRE, according to a report by the Free Press Journal, […] Read more
Extreme Events & O&M of Solar PV Plants Updated On Tue, Aug 24th, 2021 by Saurenergy Background Extreme weather events, driven by climate change, can have huge risks for solar PV systems too. For investors, reassurance of ongoing financial security of their solar system is critical to securing initial investment. PV plants are installed outdoors and whilst generating electricity, they also endure the test of nature and all her elements. How […] Read more
SECI Discovers Rs 2.34 Price In 1200 MW Solar Wind Hybrid Auction Updated On Tue, Aug 24th, 2021 by Saurenergy NTPC Limited, NLC India, Mission Ten Renewable Energy (Ayana Renewable Energy), and Azure Energy emerged as the winners in the Solar Energy Corporation of India’s (SECI) auction for 1,200 MW solar-wind hybrid projects (Tranche-IV) related to the Interstate Transmission System (ISTS). The final winning bid was at Rs 2.34/unit. Bids by other majors like ReNew […] Read more
Egypt Plans RE-powered Desalination Project amidst Swelling Water Crisis Updated On Mon, Aug 23rd, 2021 by Saurenergy Known for its pyramids, Egypt has decided to build 17 desalination water plants powered by renewable energy, under a new $2.5 billion initiative, to tackle the severe water scarcity that the Arab country is expected to soon suffer from, according to media reports. Desalination, which turns salt water into water that is fit to drink (most commonly […] Read more
Goan Students Create Solar E-cycle With 20 Li-Ion Batteries Updated On Mon, Aug 23rd, 2021 by Saurenergy Students from Goa’s Agnel Institute of Technology and Design have created a custom solar e-cycle, powered by 20 lithium-ion batteries, that can cover the distance between Panaji and Vasco on a single charge. The batteries can be charged by two solar panels or a conventional power supply point at home. The five mechanical engineering students […] Read more
25 MW Floating Solar Plant Commissioned by NTPC in Andhra Pradesh Updated On Mon, Aug 23rd, 2021 by Saurenergy The National Thermal Power Corporation (NTPC) Ltd has commissioned the largest floating solar PV project of 25MW on the reservoir of the Simhadri thermal station in Visakhapatnam, Andhra Pradesh. This is the first solar project to be set up under the Flexibilisation Scheme, which was notified by the Government of India in 2018. The solar […] Read more
KERC Sweetens Rooftop Solar tariffs To Rs 4.02/unit to Drive Adoption Updated On Fri, Aug 20th, 2021 by Saurenergy The Karnataka Electricity Regulatory Commission has passed an order on generic solar tariffs for the state. It has hiked solar rooftop tariffs to Rs 4.02, mainly in an effort to increase rooftop solar adoption, an area where the commission felt progress had been tardy. KERC has determined the generic tariff as follows: For grid connected […] Read more