Proposed Amendment by Power Ministry To Power Corporate and Industrial RE Development Updated On Mon, Nov 1st, 2021 by Saurenergy With 4 stakeholder consultations already held, the proposal by the power ministry to amend the Energy Conservation Act, 2001 is moving ahead. The amendments will have the twin objectives of enhancing demand for renewable energy at the end- use sectors such as Industry, buildings, transport etc, and also support the climate goals commitments of the […] Read more
Tata Pwr, Tata Steel to Set Up 41MW Solar Plants in Jharkhand & Odisha Updated On Fri, Oct 29th, 2021 by Saurenergy Tata Power and Tata Steel, the two flagship companies of the Tata Group, have come together to develop grid-connected solar plants in Jharkhand and Odisha. The two companies have signed a Power Purchase Agreement (PPA) for a duration of 25 years to set up 41MW solar project, which will be a combination of rooftop, floating […] Read more
56% Solar Projects Planned for 2022 at Risk due to Mfg Cost Hike: Rystad Updated On Fri, Oct 29th, 2021 by Saurenergy The earliest estimates on the impact of price volatility and rising costs on solar projects worldwide are finally coming out, and the news is not good. The surging cost of manufacturing materials and shipping could threaten 50 gigawatts (GW) – a staggering 56% – of the 90 GW of global utility PV developments planned for […] Read more
Tata Power Q2 Results and Presentation. Profits Strong, Revenues Hit By Thermal Drop Updated On Fri, Oct 29th, 2021 by Saurenergy Tata Power Company Limited has reported Consolidated financial results for the period ended September 30, 2021. The firm, at the forefront of the transition to renewable energy from thermal power earlier, has been pushing aggressively to growth capacities, as well as integrate operations around renewable energy. The company reported total income of Rs.10187.33 crores during […] Read more
Solar Energy Specialist Updated On Thu, Oct 28th, 2021 by Saurenergy Responsible for providing technical guidance to design and project execution teams on concepts, value engineering and best practices that apply to design delivery of renewable solar energy facilities. Shall bring to bear profound knowledge of available technologies, technology advancements around the globe, equipment, systems and hardware offerings that are state-of-the-art, and design and erection options […] Read more
Expect Tariff Hike by 20-25 Paise/Unit in Upcoming Solar Bids: ICRA Updated On Thu, Oct 28th, 2021 by Saurenergy The increase in module prices and the recent hike in GST rate for solar power equipment from 5% to 12% is likely to increase the tariffs in the forthcoming solar bids by ~20-25 paise per unit from the levels seen over the past six months, finds a new ICRA report. Nonetheless tariffs are likely to […] Read more
Apple Adds 9 GW of Clean Power and Doubles Supplier Commitments Updated On Thu, Oct 28th, 2021 by Saurenergy Technology giant Apple has revealed that the company has more than doubled the number of suppliers committed to using 100 percent clean energy over the last year, accelerating progress toward its ambitious 2030 goal to be carbon neutral across its supply chain and products. In total, 175 Apple suppliers will transition to using renewable energy, […] Read more
Best Power Equipments Launches Lithium Powered UPS Systems Updated On Wed, Oct 27th, 2021 by Saurenergy Noida-based Best Power Equipments (India) Pvt Ltd (BPE), a leading power manufacturing brand has recently started offering lithium battery solutions with a 5 year warranty. The Lithium batteries will last longer and recharge faster, saving time, money and reducing risk throughout the lifecycle of the uninterruptible power systems (UPS). Due to its higher reliability, efficiency […] Read more
India Added >10 GW Solar & Wind Capacity from Jan-Sept’21: Report Updated On Wed, Oct 27th, 2021 by Saurenergy From January 2021 till September 2021, approximately 8,811 MW solar capacity and 1,246 MW of wind capacity was added in India, according to a new report by JMK Research. This is about 280% and 101%, respectively, higher compared to the same period previous year. The key reason for the significant increase is the commissioning of […] Read more