MAHAPREIT Calls Solar Developers to Bid for 50 MW Solar Plant Updated On Wed, Aug 16th, 2023 by Saurenergy Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT) has issued a tender to obtain offers from Solar Power Developers (SPDs) for the design, engineering, manufacture, supply, erection, testing and commissioning of 50 MW AC Crystalline Solar PV technology grid interactive solar PV power plant. It will also entail five years of operation and maintenance. […] Read more
Electrify America’s 75 MW Solar Farm Gets the Ball Rolling Updated On Wed, Aug 16th, 2023 by Saurenergy Electrify America, the open network of DC fast chargers for electric vehicles (EVs) in the US has kickstarted operations of its 75 MW solar renewable energy generation project referred to as Electrify America Solar Glow 1, located in San Bernardino County, CA. The Electrify America Solar Glow 1 extends to over a square mile and […] Read more
SECI Issues RFS for 1300 MW Wind Power Projects Updated On Mon, Aug 14th, 2023 by Saurenergy SECI has issued an RfS for 1300 MW ISTS-connected Wind Power Projects (SECI-Tranche-XV). The tender has been issued under the standard bidding guidelines. The total capacity of 1300 MW will be awarded for injection at ISTS substations in the 3 (three) states, viz., Tamil Nadu, Telangana and Madhya Pradesh. The maximum capacities to be awarded […] Read more
AmpIn Energy Joins Hands with JCAPCPL for 2.8 MWp Solar Project Updated On Mon, Aug 14th, 2023 by Saurenergy AmpIn Energy Transition, a renewable energy IPP and energy transition platform has entered into a 25-year Power Purchase Agreement (PPA) with JCAPCPL (a JV between Tata Steel & Nippon Steel) to supply 2.8 MWp of solar energy for its plant in Jamshedpur. Ujjal Chakraborti, Managing Director of JCAPCPL, and Pinaki Bhattacharyya, Managing Director and CEO […] Read more
DEWA Picks Masdar to Manage 1.8GW Mohammed bin Rashid Al Maktoum Solar Park Phase 6 Updated On Mon, Aug 14th, 2023 by Saurenergy Dubai Electricity and Water Authority (DEWA) has selected the state-owned renewable energy firm Masdar for the construction and management of the 1,800-megawatt (MW) phase 6 of the Mohammed bin Rashid Al Maktoum Solar Park. Reportedly, Saeed Mohammed Al-Tayer, DEWA’s managing director and CEO made the announcement. The project will be built at an estimated cost […] Read more
SJVN Bags Floating Solar Project of 90 MW in Madhya Pradesh Updated On Fri, Aug 11th, 2023 by Saurenergy SJVN Green Energy Ltd (SGEL) has bagged 90 MW capacity for the Omkareshwar floating solar project located in Madhya Pradesh. This is the second win for the said project for SJVN since the firm had also bagged 90 MW of the capacity for it in January 2023. The project has been won at INR 3.79 […] Read more
Solar Energy to Light Up Bundelkhand Expressway in Uttar Pradesh Updated On Fri, Aug 11th, 2023 by Saurenergy Uttar Pradesh is set to welcome its first solar expressway. The 296-kilometer-long Bundelkhand Expressway will be the first solar expressway that will see the installation of solar panels on both sides of its stretch. The project announced comes as part of the state government’s Solar Energy Policy 2022. The policy strives for 22,000 MW of […] Read more
SECI Projects Account For 18% of India’s Solar Capacity: Govt Updated On Fri, Aug 11th, 2023 by Saurenergy The Ministry of New and Renewable Energy (MNRE) claimed that 18.3 percent of India’s total solar energy capacity was contributed by the Solar Energy Corporation of India (SECI). The information was given by the Union New and Renewable Energy Minister RK Singh in his written reply before the Lok Sabha. The minister said that in […] Read more
North Canada to Welcome its Biggest Solar Plant from Mining Group Rio Tinto Updated On Fri, Aug 11th, 2023 by Saurenergy Spain’s mining group Rio Tinto’s Diavik Diamond Mine is set to establish the largest solar power plant across Canada’s territories. The plant will boast of more than 6,600 solar panels. The project will generate close to 4,200 MWh of carbon-free electricity annually for the mine. Commercial production from the operation is slated for completion in […] Read more