HPPCL Issues Tender For 13 MW Solar Project In Solan Updated On Fri, Mar 22nd, 2024 by Saurenergy HPPCL has issued a tender inviting online bids from eligible and qualified bidders on Single Stage Two Envelope (i.e. Envelope-I: Technical Bid and Envelope-II: Price Bid for the work with e-Reverse Auction for “ Design, Supply, Construction & Erection, Testing, Commissioning and Operation & Maintenance For 08 (Eight) Years of Solar Power Projects, of 13 […] Read more
Design Lead – Instrumentation for solar plant Updated On Fri, Mar 22nd, 2024 by Saurenergy The person shall be responsible for Carrying out complete design and detailed engineering of instrumentation /Automation of Solar Power plants like Mini Grid and Mega watt scales plants ,roof top plants . The Design Engineer is responsible for carrying out the entire design for a project or a set of smaller projects including co-ordination […] Read more
Gensol Engineering Secures Rs 520 Crore Solar Project in Maharashtra Updated On Fri, Mar 22nd, 2024 by Saurenergy Gensol Engineering Limited, an Indian solar power engineering, procurement, and construction (EPC) services and electric mobility company, has secured one of the largest-ever turnkey EPC orders in size and value from a leading power generation utility in the state of Maharashtra, the firm said today. The project involves developing a 100 MWAC/135 MWp ground-mount solar […] Read more
Gensol Commissions 10.6 MW Trident Solar Project In MP Updated On Fri, Mar 22nd, 2024 by Saurenergy Gensol Engineering, solar engineering, procurement, and construction (EPC) company has announced that it has started a 10.6 MW rooftop solar project for Trident group’s Budhni Textile Unit in Madhya Pradesh. According to press release by the company, the project utilises nearly 20,000 545W Longi Hi-MO 5 Bifacial Dual Glass LR5-72HBD modules and is expected to […] Read more
SOFAR Brings PV & ESS Solutions At Solar Solutions 2024 Updated On Thu, Mar 21st, 2024 by Saurenergy Photovoltaic and Energy Storage System solutions company SOFAR presented its various products during the Solar Solution conclave 2024. SOFAR PowerMagic, a system crafted for C&I ESS, made a debut at the expo. It’s endowed with an efficient liquid cooling system and intelligent temperature control, promising unsurpassed cooling capabilities and energy efficiency. The modular design allows […] Read more
India To Generate 600 kT Solar Waste From Installed, New Capacity By 2030, Finds Study Updated On Thu, Mar 21st, 2024 by Saurenergy India’s installed 66.7 GW solar capacity, as of FY23, has generated about 100 kilotonnes (kt) of waste, which will increase to 340 kt by 2030, according to a study conducted by the Ministry of New and Renewable Energy and Council on Energy, Environment and Water (CEEW) ‘Enabling a Circular Economy in India’s Solar Industry: Assessing […] Read more
Arevon Inks Deal With San Diego Community Power For Avocet Energy Storage Updated On Wed, Mar 20th, 2024 by Saurenergy US-based renewable energy developer Arevon Energy has announced it has entered into a 15-year energy storage service agreement with San Diego Community Power (SDCP), California’s second-largest community choice aggregator, for the full capacity of the Avocet Energy Storage Project. The project is a 200-megawatt (MW)/800 megawatt-hours (MWh) stand-alone battery energy storage system (BESS) located in […] Read more
Barclays, Lightsource bp Sign $140 Million Deal For Louisiana Solar Project Updated On Wed, Mar 20th, 2024 by Saurenergy Barclays and Lightsource bp have announced that they have committed to a $140 million tax equity deal which will finance the construction of the Prairie Ronde 180MWdc solar project in St. Landry Parish, Louisiana. According to a media statement by Lightsource bp, the deal is one of the first to be led by Barclays’ new […] Read more
Relief On The Horizon For Solar Developers In GIB Zone In Rajasthan Updated On Wed, Mar 20th, 2024 by Saurenergy In developments in the vital GIB case that has impacted almost 20 GW of solar capacity additions by some estimates, the matter of building Solar Plants in a massive 80,000 square Km zone termed the Great Indian Bustard (GIB) habitat zone seems closer to a resolution. The issue had been the demand of conservationists, being […] Read more