Ingeteam Smart SCADA Solution Reaches 20 GW Milestone Updated On Tue, Sep 7th, 2021 by Saurenergy Energy conversion specialist Ingeteam Wind Energy has integrated its all-in-one SCADA software across 20 GW of renewable energy projects worldwide. Ingeteam has been engaged in asset monitoring and plant performance optimization for over three decades. In the past few years, the company has enjoyed increasingly strong demand for its INGESYS™ Smart SCADA suite across all […] Read more
Ayana Renewable, Greenstat Hydrogen Sign MOU For Hydrogen Development In India Updated On Tue, Sep 7th, 2021 by Saurenergy Ayana Renewable Power, a renewable energy platform majority controlled by National Investment and Infrastructure Fund (NIIF), focuses on development of utility scale renewable projects in India. Ayana’s vision is to be the lowest cost renewable energy producer which utilizes technology to maximize value creation. Ayana and Greenstat Hydrogen India, a Norwegian energy organization, recently signed […] Read more
Coal India Tenders For Partners To Build A 4 GW PV Ingot-wafer-cell-module Manufacturing Plant Updated On Tue, Sep 7th, 2021 by Saurenergy State-owned Coal India Limited has invited requests for qualification (RFQ) from prospective equity partners who wish to be shortlisted for setting up 4 GW solar PV ingot-wafer-cell-module manufacturing plant. The move is significant considering all the solar manufacturing in India is focused on cells and modules, besides mounting structures. The complete value chain, from ingots […] Read more
IREDA Releases List of Tentative Bidders for 5 GW CPSU Scheme Updated On Mon, Sep 6th, 2021 by Saurenergy The Indian Renewable Energy Development Agency Ltd. (IREDA), the agency appointed by Ministry of New & Renewable Energy (MNRE) for the implementation of the CPSU Scheme Phase II, has released a tentative list of bidders for building 5000 MW capacity of renewable energy. Under the Central Public Sector Undertaking (CPSU) scheme phase-II, 12,000 MW grid-connected […] Read more
LONGi’s H1 FY21 Results Out: US$5.438 B Revenue Reported Updated On Mon, Sep 6th, 2021 by Saurenergy Chinese module manufacturer LONGi has released its financial results for the first half of 2021, reporting revenue of 35.098 billion yuan (around US$5.438 billion), an increase of 74.26% compared to the same period of last year. The company earned a net profit of 4.993 billion yuan (around US$773.688 million), up 21.30% over the prior-year period. […] Read more
REI Expo 2021 Is Back. Important Dates and Details Updated On Mon, Sep 6th, 2021 by Saurenergy The Renewable Energy India (REI) Expo, among Asia’s largest and most influential expo’s in the RE space by Informa Markets in India, is back this year in its 14th epic edition in a physical format. Scheduled for 15th – 17th September 2021 at the India Expo Mart, Greater Noida, REI is supported by Indian Biogas Association (IBA), […] Read more
US Vanadium Announces $2.1 M Production Capacity Expansion Updated On Mon, Sep 6th, 2021 by Saurenergy American chemicals producer US Vanadium has announced a $2.1 million expansion of its production capacity for ultra-high-purity electrolyte used by grid-level vanadium flow batteries (VRFB). The production expansion comes on the heels of a purchase agreement for 580,000 litres of ultra-high-purity electrolyte by Austrian VRFB manufacturer and energy storage provider Enerox GmbH, which sells its […] Read more
Hungarian Village Gets Mobile Energy Storage Unit Updated On Mon, Sep 6th, 2021 by Saurenergy German electric utility E.ON has been developing large-scale mobile and flexible battery storage systems (BESS) in Hungary to facilitate the integration of new green power plants into existing grids at short notice. Last week the company connected the third such mobile storage system to the local distribution grid in Dúzs. The move was part of the EU-funded […] Read more
65% Of Aspiring Developers Choose To Exit PPA’s in GUVNL Projects In Gujarat Updated On Mon, Sep 6th, 2021 by Saurenergy The Gujarat Urja Vikas Nigam Limited (GUVNL) has received 2605 applications from aspiring solar developers to exit their project commitments, after the utlity offered a one time exit option to developers from the signed PPA’s. The development followed the decision by the state government to offer zero subsidy for these smaller projects, at a fixed […] Read more