RK Singh Urges States To Form Steering Committees On Clean Energy Transition Updated On Wed, May 25th, 2022 by Saurenergy Union Power Minister RK Singh has asked all chief ministers, and lieutenant governors of Union Territories to set up state-level steering committees for energy transition to reduce carbon emissions. A statement from power ministry reads, “Singh stressed on the role of the state governments for successful implementation of reduction in emission intensity by 45 percent […] Read more
Lead Engineer – Generator & BOP Updated On Wed, May 25th, 2022 by Saurenergy As a Lead Engineer – Generator & BOP (Electrical) you will report to the Plant Manager / Maintenance Manager and will be responsible to handle Operation and Maintenance works for Hydro Power Plant. More specifically: Support proactively all HSSE procedures and policies and ensure all department workers adhere to the Statkraft HSSE policies and procedures. […] Read more
Lead Engineer – Turbine & BOP Updated On Wed, May 25th, 2022 by Saurenergy As a Lead Engineer – Turbine & BOP (Mechanical) you will report to the Plant Manager / Maintenance Manager and will be responsible to handle Operation and Maintenance works for Hydro Power Plant. More specifically: Support proactively all HSSE procedures and policies and ensure all department workers adhere to the Statkraft HSSE policies and procedures. […] Read more
Topsoe Unveils Plans To Build World’s Largest Electrolyser Plant Updated On Wed, May 25th, 2022 by Saurenergy Denmark based decarbonization major Topsoe is going to build in Herning the world’s most advanced electrolyser production plant in order to meet society’s need for Power-to-X solutions. In this field, the company has the leading technology to decarbonize hard-to-abate sectors such as transport, chemicals, steel, and cement. A statement released by the company mentioned that […] Read more
Services Specialist – Commissioning Updated On Wed, May 25th, 2022 by Saurenergy All resources, and logistics required to perform services and maintenance activities on customers’ site/property. These activities contribute to, maintain, repair and refurbish sold or existing products. Includes all types of maintenance service (preventive and remedial), manage maintenance facilities and field services engineering. Accountable for the quality of own work. Subject to direct operations supervision/prescribed work […] Read more
Assistant Engineer Updated On Wed, May 25th, 2022 by Saurenergy To perform this role successfully, the candidate will be responsible for but not limited to the following: In depth knowledge of conducting simulations and analytical studies for transmission and Distribution, Planning, load and generation interconnection, integration of renewables. Able to prepare simulation study models and carry out power system studies including but not limited to: […] Read more
Ericsson, Deutsche Telekom successfully operate 5G site with hybrid RE Updated On Wed, May 25th, 2022 by Saurenergy Ericsson has announced a successful trial on Germany’s telecom player Deutsche Telekom‘s 5G-enabled network and has said that this could pave the way for major advances in sustainable mobile site operations with renewable energy while optimizing power supply and demand. A major goal of the Ericsson-DT partnership is to identify and validate energy efficiency and […] Read more
Shell and Inaccess to deploy Unity Platform in 100MW Hybrid Project Updated On Wed, May 25th, 2022 by Saurenergy As part of its global push in the renewable energy space, global energy firm Shell has developed a hybrid asset in the Netherlands in collaboration with Inaccess that would help in monitoring and controlling the renewable energy project. The Shell-developed renewable power plant consists of a 50MW photovoltaic power plant and a 50MW wind farm. […] Read more
Andhra Pradesh And Adani Green Sign 60,000 Cr MoU Updated On Wed, May 25th, 2022 by Saurenergy Andhra Pradesh and Adani Green Energy signed a Memorandum of Understanding (MoU) on May 23 to set up two mega green energy projects at an estimated cost of Rs 60,000 crore in the State. Besides establishing a 3,700 MV hydro storage project, the renewable energy company will also set up a 10,000 MW Solar Power […] Read more