Co-Development of Renewable Energy Projects by French Firm Voltalia in Uzbekistan Updated On Thu, Nov 24th, 2022 by Saurenergy The Uzbekistan government and the French renewable energy company, Voltalia have agreed to jointly build renewable energy projects with a combined output of between 400 MW and 500 MW. As part of the cooperation, 60MW/240 MWh of battery storage, 200 MW of solar, and 200 MW of wind capacity, will all be developed. The Voltalia […] Read more
Enel Gears to Add 21 GW Renewable Assets in Core Countries Updated On Thu, Nov 24th, 2022 by Saurenergy Enel, an Italian multinational manufacturer and distributor of electricity and gas is exiting the big markets of Romania, Peru and Argentina and now the company has held that its exit is a part of the 2023-2025 strategic plan under which Enel will focus on Spain, the US, Brazil, Colombia, Chile and its home market Italy. […] Read more
Tesla Constructs Europe’s Biggest Battery Next to Dogger Bank Offshore Wind Project Updated On Thu, Nov 24th, 2022 by Saurenergy A Tesla battery developer has claimed to be the largest battery deployed in Europe so far by storage capacity. The battery has been turned on in northeast England, close to the grid connection point for the sizable Dogger Bank offshore wind farm- a joint venture between SSE Renewables, Equinor (40%) and Vårgrønn. The industry leader […] Read more
Ontario Teachers’ to Invest $805 Mn of NextEra’s Renewable Energy Projects Updated On Wed, Nov 23rd, 2022 by Saurenergy Ace global investor Ontario Teachers’ Pension Plan Board (Ontario Teachers’) has said that it has signed an agreement to invest approximately $805 million in a convertible equity portfolio financing with NextEra Energy Partners. Ontario Teachers’ said that it is committed to the investment as part of the sale of renewable energy assets from NextEra Energy Resources, […] Read more
Lead Design Engineer Civil & Structural Updated On Wed, Nov 23rd, 2022 by Saurenergy The person shall be responsible for the complete design and detailed engineering for Solar Power plants like Mini Grid and Megawatt scale plants, roof top plants. The Design Lead shall manage and review the entire design documents and drawings for a project or a set of smaller projects including co-ordination with other disciplines viz., Electrical, […] Read more
Hyperion Unveils Mobile Station For Hydrogen & Electric Vehicles Updated On Wed, Nov 23rd, 2022 by Saurenergy Hydrogen technology conglomerate Hyperion Motors has announced the launch of its Hyper:Fuel Mobile Stations that are capable of refueling both hydrogen fuel cell electric vehicles (FCEVs) and battery electric vehicles (BEVs). The official statement of Hyperion held that the mobilized refueling station will be available across the USA, and can be easily deployed and redeployed when driving […] Read more
India Gets Its First Center of Excellence for Green Port and Shipping Updated On Wed, Nov 23rd, 2022 by Saurenergy The first National Center of Excellence for Green Port and Shipping (NCoEGPS) in India was unveiled recently by the Union Minister of Ports, Shipping, and Waterways, Sarbananda Sonowal. This is a significant effort on the part of the Ministry of Ports, and Shipping to provide greener solutions. The Union Minister made the revelation at INMARCO […] Read more
HDFC Bank to Make Significant Investments in EV Loans Updated On Tue, Nov 22nd, 2022 by Saurenergy Despite certain setbacks on the level of the auto industry, HDFC Bank is seeking to triple its financing for electric vehicle (EV) purchases in the next three years. This is due to an early assessment that lending is proving to be profitable. The banking institution aims to triple the ebook dimension by 2025 after initially […] Read more
CERC Quashes Avaada’s Plea for Extension of LTA Operationalisation Date Updated On Tue, Nov 22nd, 2022 by Saurenergy The Petitioners, Avaada Energy Private Limited (AEPL) and Avaada Sustainable RJ Project Private Limited (ASRJPPL), Petitioner have filed petitions against Central Transmission Utility of India Limited (CTUIL) to extend the start date of Long Term Access (LTA) granted to AEPL from 23.8.2021 to 12.5.2022. AEPL has stated that as per its letter dated 10.1.2022, it […] Read more