Maharashtra Energy Development Agency Updated On Mon, Jun 26th, 2023 by Saurenergy Design, Manufacture, Supply, Installation, Testing And Commissioning With Five Years Comprehensive Maintenance Contract Of Total 60 Kw Grid Connected Solar Pv Power Plant With Full Load Battery Backup (Hybrid System) For 04 Hours Under Roof-Top Net M Read more
South Western Railway Updated On Mon, Jun 26th, 2023 by Saurenergy Provision Of 200 Kwp Solar Power Plant For Making Energy Neutral At Rail Soudha. Read more
Jodhpur Vidyut Vitaran Nigam Limited Updated On Mon, Jun 26th, 2023 by Saurenergy Design survey installation commissioning 25 yrs O & M from COD of grid connected SPP through RESCO Mode its associated line 33 or 11 KV to connect plant to 33 11 kv substation RMS of Solar Power plant Read more
CIP Pledges $350 Million for South Korea’s Offshore Wind Expansion Updated On Mon, Jun 26th, 2023 by Saurenergy Copenhagen Infrastructure Partners (CIP) signed an Investment Notification Form in the presence of the Republic of Korea’s President Yoon Suk-Yeol, committing to inject $350 million into offshore wind projects in South Korea. Through their funds, CIP aims to facilitate developing and constructing gigawatt-scale offshore wind projects in the country. These projects are situated in the […] Read more
Assistant Performance Engineer Updated On Fri, Jun 23rd, 2023 by Saurenergy The Assistant Performance Engineer will be based in Hyderabad. Onboarding will be virtual for the time being with occasional socially distanced meetings at a Nextracker office. In this position, you will report to the Assistant Manager. The candidate would be working on utility scale solar PV projects located around the globe, right from the development […] Read more
Assistant Manager – Product Development Updated On Fri, Jun 23rd, 2023 by Saurenergy The Assistant Manager – Product Development will be based in Hyderabad. In this position, you will report to the Senior Manager – Product Development. Candidate will contribute towards mechanical design Nextracker’s tracking solutions. Candidate will develop CAD models, component drawings, perform FEA and test the components in testing lab to meet ensure minimum product standard […] Read more
Govt Amends RE Bundling Norms, Allows Joint Ventures Updated On Fri, Jun 23rd, 2023 by Saurenergy The Ministry of Power has issued a notification to amend some portions of the scheme for bundling renewable energy with thermal/hydropower energy. The new changes are related to allowing joint ventures (JVs) to set up renewable energy plants for the purpose and about the location of such plants. The ministry said that the new changes […] Read more
Startup Profile-ZEVPoint E-Mobility Updated On Fri, Jun 23rd, 2023 by Saurenergy ZEVPoint E-Mobility is an Indian start-up into EV charging infrastructure space offering fast and secure charging solutions for home & commercial clients that suits their needs. Its flagship product is the Swift Pro EV charger that comes with features like monitoring usage, password protection, scheduling your charging time and power, and intelligent safety chip for […] Read more
Final Rules For Indian Carbon Credit Market Within 15 Days: Govt Updated On Thu, Jun 22nd, 2023 by Saurenergy Higher officials from the Ministry of Power today claimed that the final rules to govern the Indian Carbon Credit Market are expected to be out in the next 15 days. The officials said that after exhaustive consultations with the stakeholders, the ministry is set to come out with the final rules. It comes after the […] Read more