JAKEDA Issues EoI for EPC, O&M of Rooftop Project of 200 MW Under Jammu Solar City Mission Updated On Mon, May 8th, 2023 by Saurenergy Jammu and Kashmir Energy Development Agency (JAKEDA), has invited sealed EoI from eligible firms/vendors for solar photovoltaics as per MNRE, GoI, policy and guidelines for phase-II of grid connected rooftop solar PV power plants scheme for site survey, design, supply, erecting, testing and commissioning including warranty, comprehensive maintenance contract (CMC) for five (05) years of […] Read more
Solar Module Manufacturer JinkoSolar Tops Global Solar PV Market in Q1 Updated On Mon, May 8th, 2023 by Saurenergy A newly released report published notes that JinkoSolar topped the global solar PV market in Q1, beating out “JA Solar, Trina, Longi, and other top sellers” (Solarbe, 2023).” JinkoSolar delivered 13.04 GW solar panels in Q1 2023, among which nearly 50% is N-type Tiger Neo panel, the most of any of the solar PV brands. […] Read more
Icon Solar Aims To Touch USD 200 million sales by 2025: Shakti Dubey, Director Updated On Mon, May 8th, 2023 by Saurenergy Shakti Kumar Dubey is the Director of Icon Solar-En Power Technologies Private Limited (En-Icon), an Indian solar module manufacturing company. The company started its operations nine years ago and has expanded its base since then in the country. En-icon has also been important in supplying solar pumps under the PM-KUSUM and other solar pump schemes. In […] Read more
Invenergy, Others Ready 104 MW New York Wind Farm Updated On Mon, May 8th, 2023 by Saurenergy Renewable energy developer Invenergy and Clean Path NY partners, energyRe and the New York Power Authority (NYPA), have completed a 103.9-MW Number Three Wind Energy Center marking the first Clean Path NY renewable generation asset to reach operation. The wind farm has been developed and constructed by Invenergy. Its one of more than 20 new […] Read more
NHPC Floats Tender for EPC Contract of 50 MW Floating Solar Power Project in Kerala Updated On Mon, May 8th, 2023 by Saurenergy National Hydroelectric Power Company (NHPC) has floated a tender for the Engineering Procurement and Construction (EPC) contract for the development of 50 MW floating solar power project and associated transmission system for grid connectivity along with comprehensive O&M for 05 (five) years at West Kallada, District-Kollam, in the state of Kerala. The online bid submission […] Read more
NHPC Invites Bids for EPC Contract for Development of 300 MW Floating Solar Project Updated On Mon, May 8th, 2023 by Saurenergy National Hydroelectric Power Corporation has issued a tender for the Engineering, Procurement & Construction (EPC) Contract for the development of 300 MW capacity floating solar power project and associated 220 KV transmission line for connectivity at 400 KV grid substation alongwith comprehensive operation and maintenance for 05 years at Rengali Reservoir at Angul district in […] Read more
Bihar Counts On Lower Renewable Energy To Surrender 854 MW Thermal Power Allocation Updated On Mon, May 8th, 2023 by Saurenergy In an interesting move, the Bihar State Power Holding Company Limited (BSPHCL) has chosen to surrender 854 MW of the state’s central allocation of thermal power. In doing this, the state firm is counting on both its right to exit PPA’s that are over 25 years old, and the possibility of cheaper renewable energy to […] Read more
ERG Acquires 149 MWp Solar Project Consolidating its Presence in Spain Updated On Mon, May 8th, 2023 by Saurenergy European wind & solar energy major ERG, through its subsidiary ERG Spain HoldCo SLU, has signed an agreement with IBV Solar Parks, BV, a company of the German group ib vogt GmbH which is a leading global utility-scale solar development platform. ERG said that the agreement is for the acquisition, directly or through a subsidiary, […] Read more
Singareni to Install 13 New Solar Power Plants of 240 MW Capacity Updated On Mon, May 8th, 2023 by Saurenergy With a quest to become a ‘net zero’ firm in coming years, Singareni Collieries Company Ltd (SCCL) will expand its solar power projects by 240 MW as part of the second phase of solar energy development. The firm is owned by the Telangana Government. Singareni is about to complete the first phase of solar energy […] Read more