Tomorrow Water to Provide Wastewater Treatment System for US’ Largest Solar Production Unit Updated On Wed, Aug 9th, 2023 by Saurenergy California-based Tomorrow Water, a global environmental solutions provider, has been selected to design and deliver a wastewater treatment solution. The solution keeps compliance with the regions’ Publicly Owned Treatment Works pretreatment permit limits. Tomorrow Water met the requirements with its capability to provide a cost-effective solution promising a very aggressive turnaround schedule. The contract entails […] Read more
Better Solar Technology Covers Up For Wind Issues In Hybrid Projects For Adani Green Updated On Wed, Aug 9th, 2023 by Saurenergy Adani Green Energy Limited (AGEL), in its latest financial results for Q1 of FY24, reported a decline in Capacity Utilisation Factor (CUF) for its wind portfolio. It attributed its lower CUF to the Biporjoy cyclone in Gujarat and lower wind speeds in the state. However, the latest investors call of the company to discuss the […] Read more
Mahindra Susten Signs PPA with GUVNL at INR 2.7250 INR / KWh for 200 MW Solar Project Updated On Wed, Aug 9th, 2023 by Saurenergy Mahindra Susten has entered into a Power Purchase Agreement (PPA) with GUVNL (Gujarat Urja Vikas Nigam Limited). The tender was issued by GUVNL for 500 MW Phase XIX ISTS project, while Mahindra Susten won project size of 100 MW with 100 MW greenshoe capacity. The total capacity won by the firm is 200 MW. The […] Read more
NTPC REL Wins RUMSL’s 80 MW Floating Solar Project Updated On Wed, Aug 9th, 2023 by Saurenergy NTPC Renewable Energy Limited, a subsidiary firm of energy conglomerate NTPC, has emerged successful in bidding for a 80 MW floating solar project at Khandwa, Madhya Pradesh. The tariff at which the firm won the tender floated by RUMSL (Rewa Ultra Mega Solar Limited) is an impressive INR 3.80 kWh. RUMSL is joint venture between […] Read more
Principal Engineer Energy – Civil & Structures – Substation Updated On Tue, Aug 8th, 2023 by Saurenergy Create detailed engineering drawings & designs (calculations) for Extra High Voltage (EHV) projects, covering both Air Insulated Substations (AIS) and Gas Insulated Substations (GIS), ranging from 11kV up to 400kV (with a particular emphasis on 132kV voltages and above) Operate as part of a team of engineers and designers in carrying out civil & structural […] Read more
PVHardware To Supply Solar Trackers For 805MW L&T Project In Saudi Arabia Updated On Tue, Aug 8th, 2023 by Saurenergy PVH, a leading global manufacturer and supplier of solar trackers, has announced the announce the signing of another major contract with Larsen & Toubro (L&T) for the supply of 805 MW on a solar project in Saudi Arabia at Ar Rass City. The project will be located in Saudi Arabia Qassim province near Ar Rass […] Read more
RERC Grants Compensation To Solar Firm Over Change Of Law Updated On Tue, Aug 8th, 2023 by Saurenergy The Rajasthan Electricity Regulatory Commission (RERC), in its latest order, directed the Solar Energy Corporation of India (SECI) to pay compensation to Palimarwar Solar House Private Limited, a solar developer over ‘Change of Law’ events. These change of law events were related to the increase in the Customs Duty of imported solar inverters and the levy […] Read more
Indian Register of Shipping & MPUVNL Partner for Completion of Solar Electric Boats Projects Updated On Tue, Aug 8th, 2023 by Saurenergy The Indian Register of Shipping (IRS) and MPUVNL (Madhya Pradesh Urja Vikas Nigam Ltd)- a firm owned by the Government of Madhya Pradesh and delves into the execution of renewable energy programs, have joined hands for the classification and certification of solar-electric boats. The partnership between IRS and MPUVNL will pave the way for the […] Read more
Jharkhand Seeks Empanelment of Solar Hot Water System Providers Updated On Mon, Aug 7th, 2023 by Saurenergy Jharkhand Seeks Empanelment of Solar Hot Water System Providers The Jharkhand Renewable Energy Development Agency (JREDA) has sought bids from prospective developers for solar hot water systems. The tender said that the bidders would also have to take care of the maintenance of the systems for the first five years post-commissioning. The tender document sought bids for […] Read more