Top 5 Implications of India’s New Rooftop Solar Scheme Updated On Mon, Jan 29th, 2024 by Saurenergy PM Modi’s announcement of Pradhanmantri Suryodaya Yojana, has energised industry, with hopes high for a massive impetus to rooftop solar from the scheme. From more funding and subsidies, to opportunities and jobs, the scheme holds potential to be a real gamechanger. We list the top 5 ways it will change the solar landscape in India. […] Read more
India’s Renewable Energy Capacity To Reach 54% By 2047: NREL Updated On Mon, Jan 29th, 2024 by Saurenergy A recent report by the United States (US)-based organization National Renewable Energy Laboratory (NREL) anticipated an increase in the share of renewable energy (RE) generation from wind and solar in India to reach 54 percent by 2047. The NREL report evaluated, “In the base scenario, investments in battery storage are economic in 2030 is expected […] Read more
REC Ltd, NIIFL collaborate on funding solutions for renewable energy, other infra projects Updated On Mon, Jan 29th, 2024 by Saurenergy REC Limited has signed a Memorandum of Understanding (MoU) with the National Investment and Infrastructure Fund Limited (NIIFL) to collaborate on a suite of funding solutions for “Renewable Energy Projects” as well as large-scale infrastructure projects in India. REC Ltd is a Maharatna CPSE and also a leading NBFC that comes under the ambit of […] Read more
SJVN Secures 100MW Solar Project In e-Reverse Auction In Gujarat Updated On Mon, Jan 29th, 2024 by Saurenergy SJVN Ltd has announced that it has successfully secured a 100 MW solar project in Gujarat through an e-reverse auction conducted by Gujarat Urja Vikas Nigam Ltd (GUVNL). SJVNL said that its bid was secured at a rate of Rs 2.54 per unit, following a competitive bidding process as part of GUVNL Phase XXI. The […] Read more
CapitaLand Trust Commissions 21 MW Solar Plant In Tamil Nadu Updated On Mon, Jan 29th, 2024 by Saurenergy CapitaLand India Trust (CLINT) has set up its first captive solar power plant in Tamil Nadu, India. The 21-megawatt (MW) solar plant will generate over 30 million kilowatt-hours (kWh) of electricity annually and meet the power supply needs of 2 million sq ft equivalent of office space. The power generated from the solar plant will […] Read more
Juniper Green and KPI Green Secure GUVNL’s Wind-Solar Hybrid Project Updated On Thu, Jan 25th, 2024 by Saurenergy Renewable Energy companies Juniper Green Energy Private Limited and KPI Green Energy Private Limited have been awarded the project for establishing 200 MW capacity, part of a 500 MW grid-connected wind-solar hybrid power project in Gujarat. The allocation was done by Gujarat Urja Vikas Nigam Limited (GUVNL). Another 500 MW allocation of the project will […] Read more
BHEL Haridwar Issues Tender for 5 MW Solar Project Updated On Thu, Jan 25th, 2024 by Saurenergy Bharat Heavy Electricals Ltd (BHEL) has issued a tender notification seeking developers for its 5MW solar project at Ranipur facility in Haridwar, Uttarakhand. The project will be developed under BOOM mode comprising design and construction responsibilities of design-build procurements with operations and maintenance of the project. The bids will have to be submitted by February […] Read more
Hero Future Energies Inks Pact With PIXON Green For Solar Module Supply Updated On Thu, Jan 25th, 2024 by Saurenergy Hero Future Energies has announced the signing of an agreement with PIXON Green Energy, a domestic module manufacturer, for the supply of solar PV modules. Under the agreement, PIXON Green Energy will provide Hero Future Energies with high-efficiency modules for up to 500 MW annually on a prioritized basis for two years from their automated […] Read more
₹650 cr Morbe Dam Solar Project Tender To Be Issued Soon by NMMC Updated On Thu, Jan 25th, 2024 by Saurenergy The Navi Mumbai Municipal Corporation (NMMC) will be issuing tender for a 100 MW solar PV project at the Morbe Dam that lies in Raigad, Maharashtra. The solar power project was initially conceived in 2012 but didn’t fructify due to several reasons. It is now finally progressing after a 12-year delay. NMMC also has plans […] Read more