Amplus Commissions 73.4 MWp Open Access Solar Plant In Jhansi Updated On Tue, May 14th, 2024 by Saurenergy Amplus, has announced the successful commissioning of its 73.4 MWp Project Lakshmi, an intra-state open-access solar plant in Jhansi, Uttar Pradesh. Project Lakshmi marks Amplus’s third solar open-access plant in Uttar Pradesh, following the success of Project Mirza and Project Deoria. This latest milestone elevates Amplus’s operational open-access capacity in Uttar Pradesh to over 200 […] Read more
EU To Withdraw From Probe Into Chinese Solar Park Construction Updated On Tue, May 14th, 2024 by Saurenergy Earlier this year, the United States (US) and European Union (EU) Commission announced launching an inquiry into Chinese suppliers of wind turbines under the new Foreign Subsidies Regulation. This announcement came as Chinese wind turbine manufacturers pushed hard and won some orders in Europe. The Chinese suppliers offered cheap turbines and generous finance which distorts […] Read more
HPCL Issues 300 MW EPC Tender For Solar Projects Updated On Tue, May 14th, 2024 by Saurenergy Hindustan Petroleum Corporation subsidiary HPCL Renewable and Green Energy (HPRGEL) has issued a tender inviting bids for 300 MW of interstate transmission system (ISTS)–connected solar power projects in seven states. The tender pertains to the engineering, procurement, and construction (EPC) package. The last day to submit the bids is May 30, 2024, and the bids […] Read more
US-Based Flexible Solar Firm Active Surfaces Secures $5.6M Funding Updated On Tue, May 14th, 2024 by Saurenergy US-based Active Surfaces, a flexible solar panel startup spun out from MIT, raised $5.6 million in an oversubscribed pre-seed funding round. The round was led by Safar Partners, a deep-tech venture capital fund. Additional participants—include QVT, Lendlease, Type One Ventures, Umami Capital, Sabanci Climate Ventures, New Climate Ventures, SeaX Ventures, and others—reflect a diverse support […] Read more
Tesla Gets Approval For Shanghai Megapack Energy Storage Battery Plant Updated On Tue, May 14th, 2024 by Saurenergy Tesla will be building a Megapack energy storage battery plant in China. The EV maker battery plant will come up near its electric vehicle gigafactory in Shanghai. According to a report, Tesla will invest around CNY1.5 billion (USD200 million) in the new megafactory. The factory will cover an area of about 20 hectares in the […] Read more
Estimation – Electricals (Solar Manufacturing) Updated On Mon, May 13th, 2024 by Saurenergy RESPONSIBILITIES:- Ensure Preparation cost estimate and its review (Civil, Mechanical , Electrical and services ) as per requirement for BU procurement activities Coordinate with Category management team / Engg/ Project team to get technical details for estimation requirements Support to Business development in providing cost estimates for bidding purpose Explore opportunities for enhancing efficiency in […] Read more
Supplier Quality Assurance – Solar Manufacturing Updated On Mon, May 13th, 2024 by Saurenergy RESPONSIBILITIES:- The key Roles and Responsibilities of team lead are to manage the working teams and… Supplier evaluations as per audit plans lead given by Techno commercial team. Ensure joint inspection at suppliers during initial development of raw material. Supplier onsite pre dispatch inspection for confirming incoming materials as per approved specifications standards. Ensure MDCC […] Read more
GAIL Invites Bids For Grid Tied RT Solar PV Plant Under KG Basin Updated On Mon, May 13th, 2024 by Saurenergy Gas Authority of India Limited (GAIL) India Limited, the state-owned natural gas processing and distribution company and a Maharatna Indian company, released a tender inviting bids to contract, design, supply, install, testing and commission of grid-tied rooftop solar PV plant. The project included an Annual Maintenance Contract (AMC) with a generation guarantee under Krishna Godavari […] Read more
MNRE Goes Back To the Past To Declare All Rooftop Solar As PM Surya Ghar Achievements Updated On Mon, May 13th, 2024 by Saurenergy The latest documents from the Ministry of New and Renewable Energy (MNRE) make for some starling reading for the solar sector. The MNRE in its latest physical achievements report (upto April 2024) claimed that India’s total installed capacity under PM Surya Ghar scheme touched 12 GW. This is barely a few months since the launch […] Read more