RECPDCL Releases Tender For 200 MW Solar Project In Jhansi Updated On Wed, May 22nd, 2024 by Saurenergy REC Power Development and Consultancy Limited (RECPDCL), a Central Public Sector Undertaking (CPSU) under the Ministry of Power, released a tender for the commissioning of a 200 MW (AC) grid-connected ground-mounted solar PV power plant at Jhansi, Uttar Pradesh. REC invited bids for the selection of the contractor for the design, engineering, supply, construction, erection, […] Read more
How US Import Barrier On Chinese Solar Cells Can Change Trade Game? Updated On Wed, May 22nd, 2024 by Saurenergy The recent trade barriers imposed by the United States (US) against the imports of Chinese solar equipment like solar cells has triggered speculations on the overall global trades of clean energy equipment. The Joe Biden led government recently triggered a new controversy by increasing the imports tariffs for solar cells for upto 50 percent and […] Read more
Suzlon Secures New Order Of 402 MW from Juniper Green Energy For The 3 MW series Updated On Wed, May 22nd, 2024 by Saurenergy Suzlon Group has announced new order wins for the development of 402 MW wind energy projects for Juniper Green Energy. Suzlon will install a total of 134 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower and a rated capacity of 3 MW for both projects at the Suzlon proposed site at Fatehgarh […] Read more
AI’s Growing Energy Footprint: The Hidden Cost of Our Digital Future Updated On Wed, May 22nd, 2024 by Saurenergy It’s time to talk about Artificial Intelligence (AI), and its possible impact on the environment. Convenient as it may be, AI is an energy hog. A single ChatGPT query requires 2.9 watt-hours of electricity, compared with 0.3 watt-hours for a Google search, according to the International Energy Agency. At present, data centers worldwide consume 1-2% […] Read more
Five Solar Startups Using AI To Make An Impact Updated On Tue, May 21st, 2024 by Saurenergy If tech in the 2020s had to be defined by a phrase, it’d be Artificial Intelligence or AI. With every product nowadays coming out with some form of AI, it’s not surprising to see AI make its way to solar as well. In particular, startups have been at the forefront of the AI revolution for […] Read more
SolarPower Europe Unveils Digital Agrivoltaics Map Updated On Tue, May 21st, 2024 by Saurenergy Solar trade body SolarPower Europe has launched a digital map to showcase agrivoltaics projects in ten countries in Europe, including Italy, France, Germany and the Netherlands. The map includes more than 200 projects across the continent, amassing a combined capacity of 2.8 gW. The map showcases various technologies used in agriPV projects, whether it be […] Read more
JA Solar Supplies 480MW PV Modules To Project In Chile Updated On Tue, May 21st, 2024 by Saurenergy The CEME1 480MW Project, one of the large photovoltaic (PV) installations in Chile has reached full capacity grid connection. PowerChina Huadong Engineering Corporation Limited, the contractor of the project, utilized modules from Chinese major JA Solar, emphasizing the role of its technology and products in project’s construction. Spanning approximately 400 hectares—an area equivalent to 370 […] Read more
Delayed Solar Project: Gujarat Discom, GETCO Draw GERC’s Ire Updated On Mon, May 20th, 2024 by Saurenergy The Gujarat Electricity Regulatory Commission (GERC) in its latest judgement ordered the Gujarat discom-Uttar Gujarat Vij Company Limited (UGVCL) and govt entity Gujarat Energy Transmission Corporation Limited (GETCO) to refund the amount charged to solar generators on account of delays. The case was filed by Arka Energy, Aditya Energy and their clients jointly against UGVCL, […] Read more
NHPC Opens Bids For 200 MW Solar Project In Khavda, Gujarat Updated On Mon, May 20th, 2024 by Saurenergy National Hydroelectric Power Corporation (NHPC) has invited bids for the commissioning of a 200 MW grid-connected solar PV power project in Gujarat State Electricity Corporation Limited (GSECL) renewable energy (RE) solar parks at Khavda, Gujarat (Stage-3) with operation and maintenance for 5 yrs. The NHPC tender was released on 17 May 2024 at 06:30 PM […] Read more