Australia’s ARENA Announces $100 Million Solar ScaleUp Challenge Updated On Tue, Jul 2nd, 2024 by Saurenergy The Australian Renewable Energy Agency (ARENA) has launched the global Solar ScaleUp Challenge. With an aim to identify solar innovations that can bring down costs and deliver solar faster, shortlisted submissions could gain access to a total pool of up to AU $100 million (INR 550 crores) in grant funding from ARENA. Final submissions close on 14 August 2024. […] Read more
Avaada Energy Secures 820 MWp-Hybrid Project From SJVN Updated On Mon, Jul 1st, 2024 by Saurenergy Mumbai-based Avaada Energy, a subsidiary of Avaada Group secured an 820 MWp Hybrid-Inter-State Transmission System (ISTS) capacity in the recent e-Reverse Auction (e-RA) held in June 2024. This project was awarded by SJVN Limited, as confirmed in the Letter of Award (LoA). Vineet Mittal, Chairman of Avaada Group, stated, “Securing 820 MWp-hybrid-ISTS capacity is a […] Read more
JSW Energy, SJVN Sign PPA For 700 MW Project In Rajasthan Updated On Mon, Jul 1st, 2024 by Saurenergy JSW Renew Energy (Raj) Limited, a wholly-owned step-down subsidiary of JSW Energy Limited, signed a Power Purchase Agreement (PPA) with SJVN Limited for an ISTS-connected solar capacity of 700 MW. The total locked-in capacity of JSW Renew Energy stands at 13.9 GW. The PPA is signed for the supply of power for 25 years with […] Read more
All In For Battery Based Energy Storage- Saurabh Kumar, GEAPP Updated On Mon, Jul 1st, 2024 by Saurenergy For India’s energy sector, the impact Saurabh Kumar has been well documented. Currently, the Vice President-India, GEAPP (Global Energy Alliance for People and Planet) Kumar is well known for being the man behind the LED revolution in the country, which he initiated during his stints as the key founder of the public sector Bureau of […] Read more
5 Key Takeaways: Statistical Review of World Energy Report Updated On Fri, Jun 28th, 2024 by Saurenergy As the world grapples with the dual challenges of ongoing climate change and the transition to sustainable energy sources, the Energy Institute’s Statistical Review of World Energy offers valuable insights into global energy trends. The latest edition of the report, now in its 73rd iteration and the second under the Energy Institute, analyzes data from […] Read more
June 28: Solar EPCs Back In Limelight With Stellar Day At The Exchanges Updated On Fri, Jun 28th, 2024 by Saurenergy In the stock market today, after a short gap, Waaree Renewables and KPI Green Energy stocks rose once again to hit their upper circuits at 5%. Shakti pimps, the new favourite of punters for the month also rose 5%. The move comes after a period of consolidation, and some news flow, particularly on KPI Green, […] Read more
NHPC, GUVNL Sign PPA For 200 MW Solar Power Project At Khavda Updated On Fri, Jun 28th, 2024 by Saurenergy National Hydroelectric Power Corporation (NHPC), a power generation company recently signed a Power Purchase Agreement (PPA) with Gujarat Urja Vikas Nigam Limited (GUVNL). This PPA was signed for a 200 MW capacity solar power project within Gujarat State Electricity Corporation Limited (GSECL) ‘s renewable energy (RE) park at Khavda (GSECL Stage-3). This project has an […] Read more
Govt. Clarifies Fiscal Benefits For Solar Installations In SEZs, Empowers Developers Updated On Fri, Jun 28th, 2024 by Saurenergy The Export Promotion Council for Export-Oriented Units (EoUs) and Special Economic Zones (SEZs), functioning under the Commerce Ministry, has provided clarifications to developers seeking to procure or import solar panels with fiscal benefits. The Ministry notified SEZ developers that they can establish non-conventional power plants as part of the infrastructure, eligible for fiscal benefits during […] Read more
KPI Green Gets Rs 686 Crore Credit Facilities For Kutch Solar project Updated On Fri, Jun 28th, 2024 by Saurenergy KPI Green Energy has received a final sanction letter for credit facilities amounting to Rs. 686 Crores for the development of a 200 MWAC (240 MWDC) Solar Photovoltaic Power Project in Khavda, Kutch District. According to a regulatory filing by the company, it had earlier raised Rs. 300 Crores through a Qualified Institutional Placement (QIP), […] Read more