RMC Switchgears Plans To Foray Into Solar Manufacturing Updated On Mon, Dec 16th, 2024 by Saurenergy Renewable energy company Rajasthan-based RMC Switchgears has now planned to venture into solar manufacturing. The company which recently also ventured into the solar EPC business has now plans to try hands-on manufacturing. The firm has now planned to start the manufacturing of solar modules and mounting structures with a capacity of 1GWp each. The firm […] Read more
Pune-Based EPC Firm GK Energy Limited Files DRHP for IPO Updated On Mon, Dec 16th, 2024 by Saurenergy GK Energy Limited has filed its Draft Red Herring Prospectus (DRHP) with the Securities and Exchange Board of India (SEBI). Pune-based company now plans to raise funds through an Initial Public Offering (IPO).GK Energy is a pure-play engineering, procurement and commissioning (EPC) provider of solar-powered agricultural water pump systems. The offer comprises direct-to-beneficiary sales and sales to […] Read more
Waaree Energies Secures 398 MWp Of Solar Module Orders Updated On Mon, Dec 16th, 2024 by Saurenergy Indian solar module manufacturer Waaree Energies today announced receiving orders for two significant clean energy projects. The company will now supply 398 MWp of solar modules for these two projects. While one order is for 249 MW of modules, another one is a 149 MW of orders. Without disclosing the identity of the client, the […] Read more
US To Examine Patent Dispute Between TrinaSolar & Canadian Solar Updated On Fri, Dec 13th, 2024 by Saurenergy Trinasolar US, a global firm working in smart solar products and solutions announced that the United States International Trade Commission (ITC) has voted to institute an investigation as to Trina’s patent infringement complaint against a number of Canadian Solar, Inc. entities (“Canadian Solar”). “Having considered Trina’s complaint, filed on October 23, 2024, the U.S. government […] Read more
Indus Towers, JSW Arm Invest Rs. 38.03 Cr For 130 MW Solar Project Updated On Fri, Dec 13th, 2024 by Saurenergy Indus Tower, a Haryana-based telecom tower company today entered into a power purchase agreement (PPA) with JSW Green Energy Eight Limited, a special purpose vehicle (SPV). Under this agreement, Indus Tower would receive 130 MW of renewable energy from a solar power plant under captive mode. The company also agreed to make approximately Rs 38.03 […] Read more
Ambuja Cements Commissions 200 MW Solar Project At Khavda Updated On Fri, Dec 13th, 2024 by Saurenergy Ambuja Cements, a cement and building material company, today commissioned and began power transmission from its 200 MW solar power project in Khavda in Gujarat. The balance 806 MW capacity from this project is at various stages of commissioning and is expected to start transmitting in phases between March 2025 and June 2025. This development […] Read more
Thinner, Taller Solar Modules Prone To Breakages: NREL Report Updated On Fri, Dec 13th, 2024 by Saurenergy Glass breakage has always been a concern, but until recently, the cause has been obvious. Several changes have caused an increased risk of glass breakage changes to solar PV module design and materials. A recent study by NREL showed that some glass always break into small pieces, in a pattern that shows a clear starting […] Read more
Airox Nigen Announces 2 GW Solar Module Manufacturing Facility Updated On Fri, Dec 13th, 2024 by Saurenergy Renewable energy company Airox Nigen has announced the establishment of a solar module cutting-edge manufacturing line under the brand name AHAAN SOLAR. This initiative marks the first phase of its 2 GW renewable energy facility in Haryana. The proposed plan is situated in a 17-acre Renewable Energy Park in Rohnat, Haryana. This park will also […] Read more
Assistant Manager – PMO ( Solar Manufacturing Projects) Updated On Thu, Dec 12th, 2024 by Saurenergy Support area infrastructure planning efforts at various stages, facilitate development of cost estimates and budgets, and establish reasonable cost and schedule baselines. Scheduling / Planning: Developing L-1 to L-2 schedule, S-curve and extrapolating it to L-4 to L-5 breakdown. Creating WBS for L4-L-5 level by identify the critical chain of the task. Monitoring/identifying the resource […] Read more