UK-Based Statera Secures 670MW Contracts in Auctions Updated On Fri, Mar 22nd, 2024 by Saurenergy In the latest Capacity Market auctions, UK-based Statera has provisionally secured contracts for 670MW of capacity commencing in October 2027, at a record T-4 clearing price of £65/kW. The Capacity Market ensures the UK’s security of electricity supply by guaranteeing the availability of sufficient backup power, stated a press release by Statera As per a […] Read more
IKEA Investment Arm Secures Norwegian Offshore Wind Project Updated On Thu, Mar 21st, 2024 by Saurenergy Ventyr, a consortium consisting of Parkwind and Ingka Investments, the investment arm of Ingka Group, the largest IKEA retailer, has announced its success in the Norwegian auction for the development of the Sørlige Nordsjø II phase 1 offshore project area in the Southern Norwegian North Sea. According to a media statement by Parkwind, part of […] Read more
Amazon, East Anglia Three Offshore Wind Farm Sign PPA For 159 MW RE Updated On Thu, Mar 21st, 2024 by Saurenergy Amazon recently agreed to procure 159MW from East Anglia Three, developed by Iberdrola, when the site becomes operational. An American multinational technology company collaborated with Iberdrola, which claims to be one of the world’s largest clean energy companies. Amazon expanded its long-term global clean power partnership by signing a renewable energy power purchase agreement (PPA) […] Read more
Adani Electricty Plans To Install 8,500 EV Charges In Mumbai Societies Updated On Thu, Mar 21st, 2024 by Saurenergy Adani Electricity Mumbai Ltd has announced that it has plans to install 8,500 chargers for electric vehicles (EVs) across apartment societies in Mumbai, reported news agency PTI. The Adani group company said it has launched what it calls the “share charge” initiative under which multiple EV owners can charge their vehicles, as was reported by […] Read more
Senior Wind Analyst Updated On Wed, Mar 20th, 2024 by Saurenergy Perform quality control of meteorological data such as met mast, LiDAR and SoDAR’s Design of optimal site-specific measurement campaigns for wind farm sites, including cost/benefit assessments of different technologies Follow the BPP process and carry out energy yield estimation and propose relevant optimization based on constraints Responsible and take ownership in specific development projects for […] Read more
Wind Specialist Updated On Wed, Mar 20th, 2024 by Saurenergy Oversee the collection and quality control of meteorological data to ensure maximum data coverage and minimum uncertainty Ensure meteorological station contractors comply with relevant safety and technical requirements Design of optimal site-specific measurement campaigns for wind farm sites, including cost/benefit assessments of different technologies Align with the BPP process and carry out energy yield estimation […] Read more
IPHE Meeting On Hydrogen & Fuel Cells Begins In New Delhi Updated On Wed, Mar 20th, 2024 by Saurenergy The 41st Steering Committee Meeting of the International Partnership for Hydrogen and Fuel Cells in the Economy (IPHE) is being convened in New Delhi from March 18 – 22. The first day of the five-day meeting was organised as IPHE Academic Outreach at IIT Delhi, on March 18, where the conference delegates provided valuable insights […] Read more
SECI Invites Bids For Empanelment Of Agencies Under DPR Category Updated On Wed, Mar 20th, 2024 by Saurenergy SECI has released a tender for empanelment (RfE) for performing site studies for the preparation of DPR (Category A, B, and C). SECI tender mentioned A, B, and C categories for performing site studies and for preparation of DPR. The tender mentioned the category is as follows, i) Category A: Topographic Survey with Geotechnical investigation […] Read more
German OEM Enercon Launches New 7 MW Wind Turbine Updated On Wed, Mar 20th, 2024 by Saurenergy Germany-based OEM Enercon has announced the launch of a new wind turbine with new features for the E-175 EP5. As of 2026, ENERCON’s top model will be available in a version with a new two-piece permanent magnet generator with a nominal power of 7.0 MW. Moreover, a tower with a hub height of 175 meters will be […] Read more