Change In FDRE Bidding Norms Can Aid RE Growth: EMBER Updated On Wed, Aug 14th, 2024 by Saurenergy EMBER recently released a policy paper highlighting the importance of changing the approach to bidding in the FDRE tenders to increase renewable energy (RE) capacity growth in India. It also stated that it’s unfair to make developers responsible for handling the unpredictable nature of renewable energy in contracts and that this should be rethought. EMBER […] Read more
Green Stocks August 13: Inox Wind Blows Away From the Pack With a 10% Jump Updated On Tue, Aug 13th, 2024 by Saurenergy On a day when the market dived, three green stocks stood out, namely, Adani Green Energy, Suzlon, and Inox Green, which was up a full 10%. Inox Wind in fact, is up 21% in the past month, while Suzlon is also up an even more impressive 47%. All the other stocks dropped, with Waaree and […] Read more
Waaree Energies Secures 90 MW Contract From Juniper Green Updated On Tue, Aug 13th, 2024 by Saurenergy Indian solar module manufacturers Waaree Energies has now secured a 90 MW order to supply of 540/545Wp dual glass bifacial modules to Juniper Green for their solar project in Bikaner, Rajasthan. Sunil Rathi, Director Sales, Waaree Energies said, “We are glad to have won this order of Juniper for this project represents a significant stride […] Read more
Gensol Q1 Results- Revenues Up 105% at ₹297crores, Order Book At ₹5,025 Crore Updated On Tue, Aug 13th, 2024 by Saurenergy Gensol Engineering Limited, a prominent player in the renewable energy sector specializing in solar engineering, procurement, and construction (EPC) services, along with electric mobility solutions (BluSmart), today announced its consolidated and standalone financial results for the quarter ended June 30th, 2024 (Q1 FY25). Q1 FY25 Highlights: Total Revenue was ₹297 Crore for Q1 FY25 compared to ₹145 Crore in Q1 […] Read more
Avaada Signs MoU To Develop 2750 MW Of PSPs In Maharashtra Updated On Mon, Aug 12th, 2024 by Saurenergy Indian renewable project developer Avaada Group has now announced signing of a Memorandum of Understanding (MoU) with the Maharashtra government for the development of two Pumped Storage Projects (PSPs) with a combined capacity of 2,750 MW. This comes at a time when several leading companies in India like Adani Green, Greenko and others are showing […] Read more
Extreme Temperatures: CEA Issues Clarifications To Wind Companies Updated On Mon, Aug 12th, 2024 by Saurenergy The Central Electricity Authority (CEA) has issued clarifications for the wind power companies related to their compliance with the norms related to extreme temperatures. This clarification came to the forth after the Wind Power Producers Association (WIPPA) approached the Ministry of Power. The association had earlier apprised the ministry about the hurdles in obtaining Connectivity […] Read more
India’s Renewable Capacity Surpasses 150 GW: MNRE Updated On Mon, Aug 12th, 2024 by Saurenergy India’s total renewable energy capacity (excluding large hydro) has now touched 150 Gigawatt (GW), latest data from the Ministry of New and Renewable Energy (MNRE) reveals. The latest data from the ministry for the month of July shows that India added a total of 1733.66 MW of new solar capacities. During the same period, India […] Read more
Lead Module Production – DGM / AGM Updated On Mon, Aug 12th, 2024 by Saurenergy Responsibilities:- Safety / Near miss reporting and timely closure of EHS points in Gensuit Safety interaction with associate and update the feedback in Gensuit. Production line reviews for manpower/break down if any, any abnormality and line round. Communication Meeting with associates / Team leader to ensure 100% production as per plan Previous day Production Quality […] Read more
Envision bags 116 MW Wind Turbine Deal From Blueleaf Energy Updated On Mon, Aug 12th, 2024 by Saurenergy Envision Wind Power Technologies India Private Limited has announced a major milestone by securing a 116 MW turbine supply agreement with Blueleaf Energy. This agreement involves the supply of 35 EN-156 3.3 MW turbines for a co-located wind-solar hybrid power project in Madhya Pradesh, set to commence construction in 2024 and complete by 2025. […] Read more