Floating Solar On Sea- How Close Are We ? Updated On Mon, Jun 3rd, 2024 by Saurenergy How do you supply electricity to 10,000 islands? Indonesia has over a million people who don’t have access to electricity. Floating solar aims to remedy cases like these. Proposed as a solution to the issue of land use and the issue of not being able to adopt expensive solutions like wind turbines in certain coastal […] Read more
The Top 5 Challenges For Green Hydrogen To Overcome Updated On Mon, Jun 3rd, 2024 by Saurenergy Hydrogen as a source of energy isn’t a new concept and is dubbed as a potential alternate energy source for over a century now. However, most hydrogen produced today is generated using fossil fuel energy, a source to about a billion tons of CO2 emissions equivalent per year. The concept of green hydrogen, promising considerable […] Read more
NTPC Issues Tender For 1200 MW FDRE Projects Across India Updated On Fri, May 31st, 2024 by Saurenergy NTPC invited online bids for the selection of renewable energy (RE) power generators for the supply of 1200 MW firm and dispatchable power from inter-state transmission system (ISTS) connected Renewable Energy (RE) power projects anywhere in India on a built-own-operate basis. Tender Cost: Rs. 22,500 Document Sale Start Date: 07/06/2024 at 09:00 Closing Date: 28/06/2024:at […] Read more
Green Stocks 31st May: SJVN Emerges As A Frontrunner With Its Stock Prices Climbing By 5.54% Updated On Fri, May 31st, 2024 by Saurenergy India’s stock markets finally ended a 5 day losing streak to end up in the green, and that was as good a signal as any for our green energy pack to race away. Out of 12 stocks, just two, Borosil Renewables and Gensol were in the red, as every one of the remaining 10 stocks […] Read more
Green Financing A Boon For Clean Transmission Projects: Sharib Razi Updated On Fri, May 31st, 2024 by Saurenergy What are the challenges faced by the grid, when it comes to a higher share of renewable energy? Razi: There are two major challenges with increasing share of renewables in the grid. Firstly, due to the intermittent nature of renewable energy, the peak generation of solar or wind does not coincide with the peak load […] Read more
News Brief May 31 – Domuneo, Amazon Solar, ACCIONA Energía, Sineng Electric Updated On Fri, May 31st, 2024 by Saurenergy France’s Domuneo Launches Domusolar Brand In Photovoltaic Panel Offerings The debut of its own line of photovoltaic panels employing heterojunction technology has been announced by Domuneo in France. Domuneo’s continued dedication to quality and excellence in the field of renewable energy is reflected in this calculated step. For the past two years, Domuneo has been […] Read more
UPERC Amends Rules To Expedite Rooftop Solar Installations Updated On Fri, May 31st, 2024 by Saurenergy The Uttar Pradesh Electricity Regulatory Commission (UPERC) has now amended its existing rooftop solar rules of 2019 to pave the way for faster installations of rooftop solar systems. As per the revised rules, the state commission has mandated the state discoms to complete the process of Technical Feasibility Reports (TFRs) within 15 days. The Commission […] Read more
Suzlon Secures 81.9 MW Order for 3 MW Series from Oyster Green Updated On Fri, May 31st, 2024 by Saurenergy Suzlon Group has announced a new order win for the development of an 81.9 MW wind energy project for Oyster Green Hybrid One Private Limited. Suzlon will install 26 Wind Turbine Generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower and a rated capacity of 3.15 MW each at the client’s site in Agar, Madhya […] Read more
India’s Peak Power Demand Smashes 2023 Peak, Touches 250 GW Updated On Fri, May 31st, 2024 by Saurenergy The Indian power sector met a record maximum power demand of 250 GW on 30th May’24 whereas, the non-solar demand touched an all-time high of 234.3 GW on 29th May This spike in power demand reflects the combined impact of weather-related loads and growing industrial and residential power consumption in these areas. On 30th May, […] Read more