NTPC Issues 1.2 GW Hybrid Tender With 600 MW Greenshoe Option Updated On Fri, Aug 30th, 2024 by Saurenergy NTPC has released a tender to select hybrid power generators for the supply of 1.2 GW of power from inter-state (ISTS)-connected wind-solar hybrid power projects anywhere in India. This project has a greenshoe option for an additional capacity of up to 600 MW on a Build-Own-Operate (BOO) basis with 20th of September set as the […] Read more
IREDA Expands Horizon Woth International Credit Rating from S&P Updated On Fri, Aug 30th, 2024 by Saurenergy Indian Renewable Energy Development Agency Limited (IREDA) has secured its international credit rating from S&P Global Ratings Limited. The Indian lender has been assigned ‘BBB-‘ long-term and ‘A-3’ short-term issuer credit ratings to IREDA, with Outlook ‘Stable’. This rating will enable IREDA to expand its reach in the international market, tapping into attractive sources of […] Read more
Indian RE Sector Faces A Leadership Crisis Updated On Thu, Aug 29th, 2024 by Saurenergy WalkWater Talent Advisors, an Indian executive search firm, has unveiled a study highlighting a significant leadership talent crisis within India’s rapidly growing renewable energy sector. India’s ambitious goal of increasing non-fossil energy production capacity to 500 GW by 2030, as part of the Panchamrit plan, and achieving net-zero emissions by 2070, faces a significant challenge: […] Read more
Green Stocks Aug 29: Gensol Stock Price Climbs 3.31% Updated On Thu, Aug 29th, 2024 by Saurenergy On a day when most green stocks saw a plunge in its stock prices, only two green stocks stood out. These included SJVN and Gensol Engineering which received an increase in its stock prices by 1.02% and 3.31% respectively. In contrast, the rest of the 10 green stocks saw a drop in their prices, with […] Read more
Assistant Manager-Admin Updated On Thu, Aug 29th, 2024 by Saurenergy The Solar Site Administrator is responsible for overseeing and coordinating the administrative and operational aspects of a solar energy site. This role involves ensuring smooth site operations, managing documentation, and liaising with various stakeholders to support the efficient functioning of the facility. Key Responsibilities:- Site Management:- Oversee daily operations of the solar site, ensuring compliance […] Read more
InterSolar South America: Sungrow Celebrates 20 GW Milestone Updated On Thu, Aug 29th, 2024 by Saurenergy Sungrow, a global solar inverter and energy storage system provider, presented its latest innovations in solar, storage, and EV charging at Intersolar South America, held from August 27-29, 2024. During the expo, Sungrow announced reaching a significant milestone of 20 GW in cumulative contracted inverter orders across Latin America. With supportive policies, growing investments, and […] Read more
Juniper Green Gets CERC Nod For Power Trading Licence Updated On Thu, Aug 29th, 2024 by Saurenergy Juniper Green Power Trading Private Limited, a subsidiary of Indian renewable energy company Juniper Green has now received approval from the Central Electricity Regulatory Commission (CERC) for starting power trading. This comes after the company approached the central power regulatory to get its nod. In accordance with Regulation 3(3) of the Trading Licence Regulations, a […] Read more
2023: Onshore Wind Struggles With Permits, Grid Issues: Report Updated On Thu, Aug 29th, 2024 by Saurenergy According to a recent report by energy research body– BloombergNEF (BNEF), the global transition towards clean electricity has reached new milestones, with wind and solar contributing 13.9% which is reported to reach a new record high. Additionally, a pair of new reports and findings from two reports published by BNEF: Power Transition Trends 2024, and […] Read more
TotalEnergies Launches 3 MW Floating Wind Pilot At Culzean Updated On Thu, Aug 29th, 2024 by Saurenergy TotalEnergies launched a pilot project constituting a floating wind turbine that would supply renewable power to the Culzean offshore platform in the UK North Sea. The 3 MW floating wind turbine will be located 2 km west of the Culzean platform, 220 km off the eastern coast of Scotland. This turbine, expected to be fully […] Read more