Maharashtra: NTPC Looks For Land To Build 600 MW Solar Project Updated On Mon, Oct 21st, 2024 by Saurenergy NTPC Limited has now issued a tender seeking land to develop 600 MW of solar projects in the Dhule region of Maharashtra and the successful evacuation of the clean power from the region. The power behemoth has invited the bids from bidder with prior experience in execution for grid connected Solar PV Projects/Solar Parks or […] Read more
MNRE’s Plan To Boost Off-Grid Solar In Tribal Areas Gets Impetus Updated On Mon, Oct 21st, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has secured the sanction of the President for the implementation of its revised funding for the Solar Power Scheme (for tribal and PVTG Habitations/Villages) under PM JANMAN and Pradhan Mantri Janjatiya Unnat Gram Abhiyan (PM JUGA). This replaces the previous New Solar Power Scheme (for Particularly Vulnerable […] Read more
CERC Takes Into Account PSPs, Offshore Wind, Changes Transmission Rules Updated On Mon, Oct 21st, 2024 by Saurenergy The Central Electricity Regulatory Commission (CERC) has made changes to the rules about how costs are shared for using the Inter–State Electricity Transmission System (ISTS) These new rules have been named CERC (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2024. For power plants that connect to both the national (inter-State) and local […] Read more
Oriana Power Secures 75 MW Solar Power Project At Maharashtra Updated On Mon, Oct 21st, 2024 by Saurenergy Uttar Pradesh-based Oriana Power secured an order to develop 75 MW solar power plant from Maharashtra State Electricity Distribution Company Limited (MSEDCL) at Maharashtra. MSEDCL seeks to implement feeder level solarisation under Component C of PM-KUSUM Scheme with land and transmission line. The company has made a steady progress in the renewable energy segment as […] Read more
India’s Coal Sector Need Rs. 3,29,651 Cr Investment For Green Makeover: iForest Updated On Mon, Oct 21st, 2024 by Saurenergy Internationally, countries like the United Kingdom (UK) have recently shut down their last coal power plant. India, despite being the third largest emitter globally, simply cannot follow suit, even as it has established its first committee to develop a just transition framework. This framework aims to prepare guidelines for the government to transition away from […] Read more
Gujarat Set To Build Its First Long Duration BESS Updated On Mon, Oct 21st, 2024 by Saurenergy Gujarat Urja Vikas Nigam Ltd (GUVNL), the state electricity regulatory body, has taken the first step to transition from a battery energy storage project to developing its first Long Duration Energy Storage System (LDES) in Gujarat. It has released a draft tender to select developers for an 800 MW (200 MW x 8 Hrs) battery […] Read more
Gensol and Matrix Gas Launch India’s First Green Steel Facility Updated On Mon, Oct 21st, 2024 by Saurenergy Gensol Engineering Limited and Matrix Gas & Renewables have partnered to establish India’s first and largest Green Steel production facility. This facility will utilize 100% Green Hydrogen for production. The project is one of three pilot projects sanctioned under the National Green Hydrogen Mission. MECON, the Ministry of Steel, and the Ministry of New and […] Read more
Green Stocks Oct 18: Green Stocks See Minor Revival After Jolt Updated On Fri, Oct 18th, 2024 by Saurenergy A day after jolt to the stock prices of most of the Indian green energy companies, several of these green firms seem to have revived their plunged prices. The highest growth was seen by Indian wind energy company Inox Wind which witnessed a surge of 4.5% in its stock prices compared to its price yesterday. […] Read more
Trina Solar, EGO Sign Pact To Boost Utility-Scale Projects In Italy Updated On Fri, Oct 18th, 2024 by Saurenergy Trina Solar’s International Systems Business Unit, the utility-scale solar and battery storage project development arm of Trina Solar Co, Ltd, has signed a 15-year Power Purchase Agreement (PPA) with EGO, an Italian energy management company owned by the Shell Group. This contract encompasses nine projects, totaling 69 MWp located across various regions in Italy. These […] Read more