MNRE Invites Bids for Publication of its ‘Akshay Urja’ Magazine Updated On Fri, Nov 22nd, 2019 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued a tender inviting sealed bids from reputed organisations located within Delhi and NCR, for the publication of its bi-monthly magazine ‘Akshay Urja’ in electronic format. As per the tender document, the magazine will be published both in Hindi and English separately in e-book format. Initially, it […] Read more
JA Solar Supplies 134MW PERC Double-Glass Modules in Jordan Updated On Fri, Nov 22nd, 2019 by Saurenergy Chinese high-efficiency photovoltaic (PV) products maker, JA Solar has supplied an aggregate 134 MW of its PERC double-glass solar modules to a renewable energy project developer, Fotowatio Renewable Ventures (FRV), in Jordan. These modules were supplied for two solar projects, i.e. 67MW dc Mafraq I solar plant and 67MW dc Empire solar plant, which are […] Read more
Petronas On-Track to Build Effective Biz Ecosystem in India: Rizan Ismail Updated On Fri, Nov 22nd, 2019 by Saurenergy With an aim to tap the demand for energy, power and consumer goods in India, Malaysia-based Petroliam NasionalBerhad (Petronas) is ramping up efforts to strengthen footprints in the country. With more than 20 years of strategic partnerships covering 6 business segments in India, Rizan Ismail, Chairman of Petronas Energy (India) Pvt Ltd, said “Petronas is […] Read more
Solar Inverters Ready For the Spotlight Updated On Fri, Nov 22nd, 2019 by Saurenergy For most people, thinking of solar usually brings to mind solar panels, the distinctive signature of solar energy. But this story takes a look at another critical part of the solar chain, the inverters. These devices, tasked with the job of converting DC power to AC and more, have been largely taken for granted, even […] Read more
Govt to Set up 14 MW of Solar Plants in Leh & Kargil Updated On Fri, Nov 22nd, 2019 by Saurenergy Under the Prime Minister Development Package 2015 these projects will be developed, he added. The Union Minister of State (IC) Power, New & Renewable Energy and Skill Development and Entrepreneurship, RK Singh has said on Thursday that the government is planning to set up 14 MW solar energy power plants in the Leh and Kargil region. This information was provided by […] Read more
Watch: Interaction with Krishan Kumar Sharma, VP – Asia Pacific, ReneSola Updated On Fri, Nov 22nd, 2019 by Saurenergy ReneSola is one of the leading international brands in solar project development, construction, operations and asset management. The company has its presence around the world including China, the US, Canada, the UK, France, Spain, Turkey, Poland, Japan, and Thailand. Through its extensive distribution and sales network, it has positioned itself well in order to […] Read more
Interview with Nikunj Patel, CEO, Australian Premium Solar (India) Pvt. Ltd. Updated On Fri, Nov 22nd, 2019 by Saurenergy Australian Premium Solar (APS) India, founded in 2013, is an Ahmedabad, Gujarat based company that manufacture, export, import and supply polycrystalline solar panels, polycrystalline silicon photovoltaic (PV) modules, solar panel along with solar inverter etc. The company’s client base includes residential, commercial and industrial (C&I) purposes, even for local, state or central government, or […] Read more
Is the ‘Lucky Country’ Pushing Its Luck with Climate Change? Updated On Thu, Nov 21st, 2019 by Saurenergy Australia, for long the ‘lucky country’ due to a variety of reasons, especially its size, abundance of natural resources and some would say, distance from the rest of the world, is finally feeling the heat from climate change, activists say. Is that true? And How well prepared is Australia to do its bit? Just over […] Read more
MNRE Extends Bid Submission Date for Evaluation of 5GW VGF Scheme Updated On Thu, Nov 21st, 2019 by Saurenergy Now, the last date for submitting proposals, in four envelope system, has been extended till November 27, 2019 in place of, earlier, November 20, 2019. The Ministry of New and Renewable Energy (MNRE) has further extended the bid submission deadline for the evaluation of its 5 GW (5,000 MW) Viability Gap Funding (VGF) scheme. Now, […] Read more