MNRE Releases List Of Module Makers for Government Contracts Updated On Thu, Mar 11th, 2021 by Saurenergy The ALMM list, to be updated monthly, will be valid for two years. The Ministry of New and Renewable Energy, in an office memorandum released yesterday, announced the names of 23 Indian firms those products would be eligible for use in government contracts for solar plants. The list is for module manufacturers right now. The […] Read more
AVANGRID Offshore Wind JV Vineyard Wind 1 Achieves Key Regulatory Milestone Updated On Wed, Mar 10th, 2021 by Saurenergy AVANGRID, Inc. confirmed today that the U.S. Bureau of Ocean Energy Management (BOEM) has issued the Final Environmental Impact Statement (FEIS) for Vineyard Wind 1. The issuance of the FEIS is the final step before a Record of Decision (ROD) from BOEM, the last approval required for construction on the project to begin. The project […] Read more
Mainspring Launches new Power Generation Technology; Announces $150 Mn Agreement with NextEra Updated On Wed, Mar 10th, 2021 by Saurenergy Mainspring Energy has launched the Mainspring Linear Generator, the first product in a new category of power generation technology for commercial and industrial buildings, utilities, and microgrids. The growing mandate for a reliable, affordable, and low-carbon electric grid is driving demand for new power generation technologies that can enable greatly increased use of renewable energy […] Read more
Weak Performance in Rooftop Solar a Growing Concern Updated On Wed, Mar 10th, 2021 by Saurenergy Against the overall target of 40 GW rooftop solar by 2022, an aggregate capacity of 3.73 GW has been installed as of January 31, 2021. The National Institute of Solar Energy (NISE) has estimated a rooftop solar potential of 42.83 GW in India. Based on this estimation, the central government had set a highly ambitious […] Read more
Troubleshooter and Documentation Specialist Updated On Wed, Mar 10th, 2021 by Saurenergy For our Diagnostic Center we are looking for a bright and talented Troubleshooter to join the team. The Digital Trouble Shooter tool is being rolled out on all Siemens Gamesa platforms and your primary task will be to build and maintain the Digital Trouble Shooter tool from the back office. This includes supporting and receiving […] Read more
SSN-COE Team Gets Rs 12 Cr Grant from DST for Solar Ingot Manufacturing Tech Updated On Wed, Mar 10th, 2021 by Saurenergy Researchers at SSN-COE have been awarded a Rs 12 crore grant from the DST, for tech they believe can catalyse India’s solar ingot and wafer manufacturing abilities SSN College of Engineering (SSN-COE), Chennai has announced that a team of its researchers led by Professor P. Ramasamy, Dean (Research) have been awarded a grant of Rs […] Read more
Report Tries to Predict Hurdles That may Arise in Achieving Net-Zero Emissions by 2050 Updated On Tue, Mar 9th, 2021 by Saurenergy A new report has built a 2050 energy model with almost net zero emissions, and then looked back at the hurdles which may arise along the way. The world will move from today’s global electricity generation of 24,219 TWh to a little over double this figure at 53,153 TWh per annum by 2050, with the […] Read more
Business Development Manager – Rooftop Updated On Tue, Mar 9th, 2021 by Saurenergy Qualification: B.Tech + MBA Experience: Min – 6-8yrs Location: Delhi Specific Exposure: B2B (like engineering industrial products), Solar Rooftop/Renewable Energy/Open Access/Power Trade. Exposure to deal with government bodies/authorities would be an advantage. Role Purpose: Accountable for generation of new leads, achieving the sales as targeted, in the assigned Territory / Region Generate and Maintain “Business […] Read more
Parliamentary Panel Blames MNRE of Poor Financial Planning in Vital Sector Updated On Tue, Mar 9th, 2021 by Saurenergy The parliamentary panel has stated that the low utilisation of even decreased allocated amounts is symptomatic of poor financial planning by MNRE The Standing Committee on Energy recently presented its ‘Demand for Grants 2021-22’ report for the Ministry of New and Renewable Energy (MNRE) in the parliament. Based on its findings and observations, the parliamentary […] Read more