SUBSCRIBE NEWS LETTER

west bengal

Electrical Engineer (TBM)

Responsibilities: TBM Electrical Systems: Oversee the design, installation, commissioning, and maintenance of all electrical systems on the TBM, including the main drive system, control systems, lighting systems, and communication systems. Develop electrical schematics, wiring diagrams, and control panel layouts. Troubleshoot electrical faults and implement corrective actions. Power Supply and Distribution: Design and implement the power […]

Read more

NTPC Issues Tender To Build Solar Trees For Its Bongaigaon Project

NTPC recently issued a tender to build and commission solar trees for the NTPC’s Bongaigaon project located in Assam. It invited the bids till December 30, 2024. The NTPC project will be located at the Bongaigaon Thermal Power Project, managed by NTPC’s Central Procurement Group – 2, Sipat Super Thermal Power Station in Chhattisgarh. The […]

Read more

91,194 Tribal Households Electrified Under RDSS Scheme: Minister

The latest data shared by Shripad Naik, Minister of State (MoS) for New and Renewable Energy, revealed that 91,194 Particularly Vulnerable Tribal Groups (PVTG) households have been electrified to date under the Revamped Distribution Sector Scheme (RDSS). This data includes the electrification of households under the state plan in three states, namely Gujarat, Odisha, and […]

Read more

Lead – Commercial & Analytics

Support new business opportunity qualification decisions through extensive market analysis with the objective of supporting the sustainable growth of Apraava Energy Greenfield portfolio Keep abreast of micro and macro-economic developments in the Renewable Energy, Transmission and Energy Transition space; Determine their impact on Apraava Energy and communicate the same to the team. Analyze and interpret […]

Read more

HSSE Specialist – Construction (Renewables)

Partake in the development/modification of Transmission HSSE guidelines & procedures in line with overall Apraava policies and regional HSSE regulations by providing required inputs to the Head – HSSE (RE)  Draft weekly, monthly, and annual HSSE statistics reports for the construction site detailing all safety incidents basis data from employees, O&M and OEM contractors and […]

Read more

22 States Issued Green Open Access Regulations, Parliament Told

The Green Energy Open Access (GEOA) Rule, 2022, aimed at ensuring access to affordable, reliable, sustainable, and green energy for all, was notified on June 6, 2022. The GEOA has now expanded its footprint across 22 states, according to recent data shared by the Minister of State for New and Renewable Energy, Shripad Yesso Naik, […]

Read more

Govt Released Rs 1,325 crore Till Now For PM-KUSUM

Latest data from the government furnished before the Parliament revealed that the government has infused around Rs 1,325 crore for promoting solar irrigation. This was done with the central funding for the PM-KUSUM scheme, dedicated to boosting solar irrigation across the country. The latest data said that the government invested a total of Rs 1,325.77 […]

Read more

Jharkhand: DVC Opens Bid To Build 234 MW Floating Solar Project

Damodar Valley Corporation (DVC) recently released a tender to build a 234 MW grid-tied floating solar PV (FSPV) plant. This project is located on DVC’s Maithon Dam Reservoir at Maithon Jharkhand. The project included a 10-year comprehensive Operations and Maintenance (O&M). The last date for bid submission is 7th January 2025. The DVC tender said […]

Read more

81% Of PM-KUSUM (Comp B) Capacities Come From 5 States

A latest data released by the Union government before the Parliament revealed that a lion’s share of the PM-KUSUM scheme (Component-B) comes from five states alone. The majority of these states are based in the western part of the country. Component B of the Union government schemes mandates the installation of decentralised off-grid solar pumps. […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll