Manager- Quality Updated On Mon, Dec 12th, 2022 by Saurenergy In this highly visible site leadership position the manager must run the overall site Quality function in a high-tech manufacturing environment. This is a growth opportunity ensuring corporate quality and reliability objectives are met from site start up to mature production. Responsibilities include the overall development, implementation and sustaining of the plant quality operations and […] Read more
Mainstream, Ocean Winds, Statkraft Collaborate with Aker Solutions for Floating Wind Updated On Mon, Dec 12th, 2022 by Saurenergy Global renewable energy company Mainstream Renewable Power, Ocean Winds and Statkraft have signed an MoU with Aker Solutions, in Norway to collaborate on offshore wind at Utsira Nord. The official statement held that Mainstream, Ocean Winds and Statkraft are in a consortium to pursue an application to develop floating wind power at the Utsira Nord […] Read more
Mumbai’s CSMI Airport Sets Up Electric Vehicle Fast Charging Stations Updated On Mon, Dec 12th, 2022 by Saurenergy India’s EV development has drawn attention as people are increasingly inclined to make thoughtful travel decisions. Against this backdrop, Mumbai’s Chhatrapati Shivaji Maharaj International Airport (CSMIA) has erected six sturdy DC rapid EV charging stations at Terminals 1 & 2 to make a substantial contribution to the country’s green infrastructure while understanding travelers’ preferences. Standing […] Read more
Netherlands Looking to Tender its Largest Offshore Wind Power Projects Next Year Updated On Mon, Dec 12th, 2022 by Saurenergy The Netherlands is expediting to expand the renewable energy development in a bid to end fossil fuel imports from Russia and decarbonize its economy. In a latest key development, the Netherlands’ Ministry of Economic Affairs and Climate Policy (EZK) has said that it is working on plans to amalgamate the first four offshore wind energy […] Read more
Pan IIT Alumni Network Organises EV Conclave to Reflect on E-Mobility Ecosystem Updated On Fri, Dec 9th, 2022 by Saurenergy To address the demand, difficulties, and opportunities in the engineering, production, and adoption of EVs, Pan IIT Alumni and Alumni Associations of IIT (BHU) Varanasi bodies organised “The Future Series, the EV Ecosystem Conclave” in Delhi. At the event, academics, policymakers, and experts from across the entire e-mobility ecosystem came together to discuss the importance […] Read more
Bp Takes Control Of AREH – Australia’s Largest Renewables Project Updated On Fri, Dec 9th, 2022 by Saurenergy Global energy conglomerate bp has now officially taken over the operations at the Asian Renewable Energy Hub (AREH) – which is the largest renewable energy project in Australia – after it has acquired a 40.5 per cent equity stake in AREH. Situated in the Pilbara, Western Australia, bp held that the RE hub has potential […] Read more
NTPC Renewables Report Card: The State of The PSU’s Renewable Efforts Updated On Wed, Dec 7th, 2022 by Saurenergy India’s national generator, NTPC, works for and is under the ownership of the Ministry of Power, Government of India. It is engaged in the generation of electricity and allied activities. The company is positioned at the helm of the Indian power sector and is the largest power producer in the country. NTPC is also actively […] Read more
ReNew Power Partners With Jindal Stainless for 300MW Hybrid Project Updated On Wed, Dec 7th, 2022 by Saurenergy ReNew Power, the largest renewable energy provider in the nation, and Jindal Stainless recently entered into a deal to establish a utility-scale captive renewable energy project for the delivery of electricity to their factory in Jajpur, Odisha. By combining solar and wind energy, the project will produce 700 million units annually. With a high capacity […] Read more
Vivid Solaire’s Plea to Align LTA with Revised SCOD of Project Shot Down by CERC Updated On Tue, Dec 6th, 2022 by Saurenergy The Central Electricity Regulatory Commission (CERC) has rejected the petition of Vivid Solaire Energy Private Limited to reconsider Long-Term Access (LTA) to coincide with the revised SCOD of project and waive the transmission charges. In its petition, the Pune-based firm had filed a petition seeking a waiver for the levy of transmission charges by CTUIL […] Read more