NTPC, Chhattisgarh Genco To Build 2 GW Renewable Energy Projects Updated On Wed, Nov 27th, 2024 by Saurenergy NTPC recently signed a Memorandum of Understanding (MoU) with Chhattisgarh State Power Generation Co. Ltd. (CSPGCL) to develop up to 2 GW of renewable energy projects, including floating solar projects. To initiate the creation of this project, Chief Engineer (CP & BD) of CSPGCL, G. K. Gupta, and General Manager (Engineering) of NGEL, D. Joshi, […] Read more
Top 5: Largest Solar Projects in the Middle East Region Updated On Wed, Nov 27th, 2024 by Saurenergy The Middle East region is making strides in renewable energy growth as global development increasingly moves away from conventional sources of energy. Renewable energy sources, such as solar, wind, and green hydrogen, have become the new engines powering growth and development. Some of the major oil-producing countries, like the UAE and Saudi Arabia, are now […] Read more
Telangana Issues Tender For 1 GW Of Rooftop Solar Projects Updated On Tue, Nov 26th, 2024 by Saurenergy The Telangana State Renewable Energy Development Corporation Limited (TSREDCO) has now issued a tender for rooftop solar projects. Through this tender, the state has planned to add 1 GW of new rooftop solar capacity. The move comes as the state plays catch up on renewable capacity, considering the limited options to add large, utility scale […] Read more
5 Challenges That Can Increase Solar Module Costs In India Updated On Mon, Nov 25th, 2024 by Saurenergy The Indian solar module manufacturing sector, once heavily reliant on Chinese imports for solar modules and cells, is gradually moving toward self-reliance. However, this transition brings its own set of hurdles, which could lead to increased costs for solar panels and project development, potentially pushing solar tariffs higher in the coming years. 1. Reduced Export […] Read more
MPUVNL Invites Bids For 26 MW Rooftop Solar Project Updated On Mon, Nov 25th, 2024 by Saurenergy The Madhya Pradesh Corporation (MPUVNL) recently floated a tender to build on-grid and off-grid solar rooftop systems with a total 26 MW capacity. The last date for bid submission is December 31, 2024. The recent tender plans to develop solar projects in Madhya Pradesh (MP) and to bring standardization of rates and selection of contractors […] Read more
SaurEnergy Explains- The Solar Tender At the Centre of Adani’s US Controversy Updated On Mon, Nov 25th, 2024 by Saurenergy By now, a lot has been written about the charges brought at a US district court against key names in the Adani group, besides Azure power. While those charges will be contested no doubt by the firms as already announced, it is a good time to understand just what tender it was where allegations of […] Read more
Senior Engineer- Solar Asset Management Updated On Fri, Nov 22nd, 2024 by Saurenergy Should have sound knowledge on basic principles of Electrical Components. Preparation of various documents as per ISO standards. Experience in problem solving by using tools like Root Cause Analysis, Corrective Action & Preventive Action process. Raising Non-Conformities, conducting RCA, CAPA and tracking closure of NCs for timely completion. Supervising and verifying preventive maintenance as per […] Read more
Senior Performance & Energy Systems Engineer Updated On Fri, Nov 22nd, 2024 by Saurenergy As a Senior Performance & Energy Systems Engineer, you will do hands-on work and provide technical leadership of technology programs in development and research of advanced energy systems. You will develop ideas and concepts to integrate, improve performance and operability of various energy generating, energy consuming and energy storage systems, including but not limited to […] Read more
Ladakh’s 13 GW Solar Dream Alive, Rs. 1,080 Cr Awarded For RDSS: Power Minister Updated On Fri, Nov 22nd, 2024 by Saurenergy Union Minister of Power and Housing and Urban Affairs, Manohar Lal, reviewed the functioning of the power and housing departments during a three-day visit to Ladakh at Leh, Union Territory (UT). The minister was also briefed on the much delayed 13 GW solar plans for Ladakh, something he duly shared with the media as well. […] Read more