Chandigarh’s 15 MW solar project delayed Updated On Wed, Dec 26th, 2018 by Saurenergy The Chandigarh Renewal Energy, Science and Technology Promotion Society (Crest) was planning to set up 15 MW solar plant. Chandigarh’s biggest solar plant project in Sector 39 for 15 MW capacity has been delayed because of the upgradation work being carried out. The Chandigarh Renewal Energy, Science and Technology Promotion Society (Crest) was planning to […] Read more
LPU Students Create Solar Powered Driverless Bus Updated On Mon, Dec 24th, 2018 by Saurenergy The first prototype of the bus will be used to ferry PM Narendra Modi to the Indian Science Congress venue which will be held in LPU. In a proud development, students from various department of Lovely Professional University (LPU) have recently designed and built a driverless car which is powered using solar energy. The first […] Read more
BHEL’s Solar Plant Thrown Off-Track by Rallies and Functions Updated On Mon, Dec 24th, 2018 by Saurenergy Roughly three years ago BHEL had chalked out a plan to reduce the energy dependency on fossil fuels and had planned to install a 10 MW solar plant. Jambooree Maidan, which was the proposed site for a 10 MW solar park to be brought up by Bharat Heavy Electricals Limited (BHEL), has been hijacked by […] Read more
India’s Energy Needs to Triple by 2040: World Bank Updated On Mon, Dec 24th, 2018 by Saurenergy In fiscal 2018, when total installed capacity was more than twice the amount of peak demand, peak demand shortage still registered 2.1% in India,World Bank said. Energy demand in India will grow 30% between 2018 and 2040, a new report by the World Bank titled Dark: How Much Do Power Sector Distortions Cost South Asia […] Read more
Green Street Partners Develops 3-MW Community Solar Project in US Updated On Sat, Dec 22nd, 2018 by Saurenergy Participation in the Community Solar Project was limited to the first 400 qualified applicants who signed up and whose accounts were in good standing. Green Street Power Partners has completed the construction of a 3 MW community solar project, located on a landfill in Raynham, Massachusetts. The plant will benefit the consumers of Taunton Municipal […] Read more
Foreign Players Win Big in Gujarat Solar Park Auction Updated On Sat, Dec 22nd, 2018 by Saurenergy The previous auction conducted by Gujarat Urja Vikas Nigam in September for 500 MW saw a winning tariff of Rs 2.44 per unit. International solar developers have stood out and won the entire 700 MW capacity of the solar auction conducted by the Gujarat Urja Vikas Nigam Ltd (GUVNL). SB Energy which is backed by […] Read more
Viz-A-Viz with Ramnath Vaidyanath, CEO, WiSH Energy Updated On Sat, Dec 22nd, 2018 by Saurenergy Q. To begin with, please tell our readers more about WiSH Energy and its contribution towards clean energy in India. WiSH (Wind-Solar Hybrid) Energy was created for the sole objective of bridging the energy gap and making renewable energy accessible and affordable for all. Through constant innovation, research and human interaction, we are paving the […] Read more
Vikram Solar Commissions 100 KW Rooftop Project in Ambala Updated On Fri, Dec 21st, 2018 by Saurenergy The system will produce approximate 1.5 Lakh units of electricity annually and reduce carbon emissions by nearly 123 metric tonnes in a year. Vikram Solar, one of India’s leading module manufacturer and a prominent rooftop solar & EPC solutions provider, successfully installed a 100 KW grid tied Rooftop Solar PV system for Parijat Industries Private […] Read more
SBI Invites EoI for 3 to 5 MW Solar Project in Telangana Updated On Thu, Dec 20th, 2018 by Saurenergy The eligibility criterion mandates that the bides should have commissioned at least 10 MW of ground mounted solar projects. Embarking on an ambitious target of achieving 100% carbon neutrality by 2030, the State Bank of India (SBI) has issued an expression of interest to to procure solar energy in the capacity of 3-5 MW (offsite) […] Read more