Madhya Pradesh Regulator is Right, Don’t Consider Any Change in PPAs Updated On Sat, Feb 23rd, 2019 by Saurenergy The news that the Madhya Pradesh Electricity Regulatory Commission (MPERC) has refused the plea from the state electricity distribution companies’ (discoms) to revise the rates at which they procure wind power is to be welcomed. The MP Power management company — the holding entity of the state’s discoms, had made a plea to review the […] Read more
Wish List for The Final 2019 Budget Updated On Fri, Feb 22nd, 2019 by Saurenergy In a year when the country heads for general elections, the renewable sector has reason to look forward to a good final budget, from whoever comes to power. This is because the renewables sector has been an undisputed success story for India, and no government should be doing anything to slow it down. For the […] Read more
SECI Designated as RE Implementing Agency Updated On Fri, Feb 22nd, 2019 by Saurenergy SECI has been designated as the renewable energy implementing agency so as to facilitate the application of connectivity and LTA in ISTS network. The Solar Energy Corporation of India with the approval of the Minister for Power and New and Renewable Energy, R K Singh, has been designated as the Renewable Energy Implementing Agency of […] Read more
MNRE’s Rs 175.87 Cr RE Research and Technology Development Programme Renewed Updated On Fri, Feb 22nd, 2019 by Saurenergy The President of India has given his approval for the continuation of the Renewable Energy Research and Technology Development (RETD) program of the Ministry of New and Renewable Energy (MNRE) for implementation during 2017-18 and 2019-20 at the cost of Rs 175.87 crore. The scheme aims at scaling up R&D effort for “Renewable Energy Research […] Read more
Wind Now Provides 14% of Europe’s Electricity Updated On Fri, Feb 22nd, 2019 by Saurenergy Wind energy provided 14% of the EU’s electricity last year, up from 12% in 2017, according to statistics released by WindEurope. Wind power capacity rose in Europe by 11.3 GW in 2018. Continued growth in capacity and the use of more powerful turbines are helping to drive up wind’s share in the electricity mix. Denmark […] Read more
NISE Issues Tender For Fire Test Apparatus For SPV Modules Updated On Thu, Feb 21st, 2019 by Saurenergy The last date of bid submission is March 8, 2019. The National Institute of Solar Energy (NISE), an autonomous institute under the Ministry of New and Renewable Energy (MNRE) has issued a tender for “Fire tests, spread of flame and burning–brand tests apparatus set up” for Solar PV Modules at its campus in Gurgaon. The […] Read more
MBJ Post Shipment and Post Installation Inspection Report Updated On Thu, Feb 21st, 2019 by Saurenergy In order to realize the module test on site at the highest technical level, MBJ and there worldwide partners need the right testing equipment. MBJ invented and consistently improved the Mobile PV Laboratory for the efficient on-site testing of solar modules, so that today it works on the technical level of conventional stationary laboratories. Test […] Read more
The URGE for “Li” Vault Updated On Wed, Feb 20th, 2019 by Saurenergy Nowadays, power storage has become vital on the back of its rapid response even at the time of peak demand, as most of the power storage technologies began transmitting power back to the grid within milliseconds. Moreover, storage technologies not only help in bolstering the use of electric vehicles but also help in reducing carbon […] Read more
We Welcome The Govt Decision For 2nd Phase of RTS Scheme: Praveer Sinha Updated On Wed, Feb 20th, 2019 by Saurenergy Heavy front-ended investment of RTS has been the single biggest challenge holding back its deeper penetration, particularly in rural and semi-urban parts of the country, Sinha said. In a bid to achieve the ambitious targets of 40 GW cumulative capacity from Rooftop Solar (RTS) Projects by 2022, the government has provided its consent for the […] Read more